Smithton Substation

Named in 5 PJM planning documents for 2 projects, from October 17, 2025 to October 6, 2026.

Existingdescribed as
APSzone
138 kVkV as printed
7mentions

Also printed as: Smithton

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Misoperation Relays: Shepler Hill Junction (Charleroi - Mitchell - Yukon) 138 kV Line
APS-2024-102 · s3866.1
Not printed $3.71M 10/31/2028 Not printed 2026-10-06
TEAC
Smithton 138 kV Substation
APS-2026-001 · s3936.1
Not printed $11.52 M 12/17/2027 10 MW 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named ALLENPORT; CHARLEROI; IRON BRIDGE; MITCHELL; SMITHTON; YUKON → ALLENPORT; BELMON; CHARLEROI; IRON BRIDGE; MITCHELL; SMITHTON; YUKON 2026-01-16 2026-07-17
Substations named ALLENPORT; BELMON; CHARLEROI; IRON BRIDGE; MITCHELL; SMITHTON; YUKON → SMITHTON 2026-07-17 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 29
Misoperation Relays: Shepler Hill Junction (Charleroi - Mitchell - Yukon) 138 kV Line “At Smithton Substation, replace disconnect switches, and relaying.”
138 kV
2026-10-06 TEAC
Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 82
Smithton 138 kV Substation “At Smithton Substation: Eliminate the normally open bus tie configuration”
138 kV
2026-09-28* SRRTEP Western
APS local plan submission of the supplemental projects for 2026 RTEP p. 29
Misoperation Relays: Shepler Hill Junction (Charleroi - Mitchell - Yukon) 138 kV Line “At Smithton Substation, replace disconnect switches, and relaying.”
2026-09-28* SRRTEP Western
APS local plan submission of the supplemental projects for 2026 RTEP p. 82
Smithton 138 kV Substation “Smithton Substation is currently configured as a 138 kV straight bus”
138 kV
2026-07-17 SRRTEP Western
Item 02 - APS Supplemental Projects p. 12
Smithton 138 kV Substation “At Smithton Substation: § Eliminate the normally open bus tie configuration by installing two 138 kV line breakers and a bus tie breaker.”
138 kV
2026-01-16 SRRTEP Western
Item 03 - APS Supplemental Projects p. 3
Smithton 138 kV Substation “Smithton Substation is currently configured as a 138 kV straight bus”
138 kV
2025-10-17 SRRTEP Western
Item 02 - APS Supplemental Projects p. 8
Misoperation Relays: Shepler Hill Junction (Charleroi - Mitchell - Yukon) 138 kV Line “At Smithton Substation, replace disconnect switches, and relaying”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.