Alburtis
Named in 7 PJM planning documents for 3 projects, from October 8, 2024 to November 4, 2025.
Existingdescribed as
PPLzone
500-230kV, 500/230kV, 500kVkV as printed
9mentions
Also printed as: Alburtis substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Alburtis, PA PPL-2024-0013 · s3550 |
Conceptual | $19.9 M | 12/31/2026 | Not printed | 2025-10-08 TEAC |
| New Buffalo, PA PPL-2024-0017 · s3571 |
Conceptual | $242 M | 05/30/2028 | 1,000 MW | 2025-10-08 TEAC |
| Orefield, PA PPL-2025-0006 |
Conceptual | $194 M | 05/31/2028 | 1000 MW | 2025-11-04 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| In-service date | 05/2027 → 05/30/2028 | 2024-11-06 | 2025-01-07 |
| Cost estimate | $159 M → $194 M | 2025-06-05 | 2025-11-04 |
| In-service date | 10/2026 → 05/30/2028 | 2025-05-06 | 2025-06-05 |
| In-service date | 05/30/2028 → 05/31/2028 | 2025-06-05 | 2025-11-04 |
| Substations named | ALBURTIS; ALLENTOWN; OREFIELD; SIEGFRIED; SUSQUEHANNA; WESCOSVILLE → ALLENTOWN; OREFIELD; SIEGFRIED; SUSQUEHANNA; WESCOSVILLE | 2025-11-04 | 2026-10-06 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2025 RTEP p. 29 |
New Buffalo, PA | No role wording 500kV |
| 2026-09-08* | SRRTEP Mid-Atlantic PPL local plan submission for 2025 RTEP p. 9 |
Alburtis, PA | “Install new 250MVA 500/230kV transformers as an in-kind replacement for each of the three units of the current 500/230kV Alburtis Transformer 1” 500/230kV |
| 2025-11-04 | TEAC Item 08 - PPL Supplemental Projects p. 4 |
Orefield, PA | No role wording 500kV |
| 2025-10-08 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 29 |
New Buffalo, PA | No role wording 500kV |
| 2025-10-08 | TEAC Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 8 |
Alburtis, PA | “The Alburtis substation 500/230kV Transformer 1 is about 54 years old and reaching the end of its useful service life.” 500/230kV |
| 2025-06-05 | TEAC Item 05 - PPL Supplemental Projects p. 6 |
Orefield, PA | No role wording 500kV |
| 2025-01-07 | TEAC Item 07 - PPL Supplemental Projects p. 4 |
New Buffalo, PA | No role wording 500kV |
| 2024-11-06 | TEAC Item 08 - PPL Supplemental Projects p. 12 |
Alburtis, PA | “in-kind replacement for each of the three units of the current 500/230kV Alburtis Transformer 1” 500-230kV |
| 2024-10-08 | TEAC Item 07 - PPL Supplemental Projects p. 5 |
Alburtis, PA | No role wording 500/230kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.