Substation Scout

Highland

Named in 3 PJM planning documents for 2 projects, from October 8, 2024 to September 18, 2026.

Existingdescribed as
ATSIzone
138 kVkV as printed
3mentions

Also printed as: Highland Station · Highland Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
ATSI Transmission Zone M-3 Process Evergreen – Highland No. 3 138 kV Line Customer Connection
ATSI-2024-030 · s3456.1
Not printed $1.40 M 5/1/2025 17 MVA 2024-10-08
TEAC
Highland Station Control Building
ATSI-2024-067
Conceptual $34.05 M 04/23/2029 Not printed 2026-09-18
SRRTEP Western

Every mention

DateDocumentProjectWhat the document says about it
2026-09-18 SRRTEP Western
Item 02 - ATSI Supplemental Projects p. 7
Highland Station Control Building “The existing control building at Highland Substation is congested.”
138 kV
2026-09-08* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2024 RTEP p. 90
ATSI Transmission Zone M-3 Process Evergreen – Highland No. 3 138 kV Line Customer Connection “Revise relay settings at Evergreen and Highland substations”
138 kV
2024-10-08 TEAC
Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 90
ATSI Transmission Zone M-3 Process Evergreen – Highland No. 3 138 kV Line Customer Connection “Revise relay settings at Evergreen and Highland substations”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this