Named in 6 PJM planning documents for 2 projects, from March 4, 2025 to October 6, 2026.

Existingdescribed as
PENELECzone
230 kVkV as printed
6mentions

Also printed as: Forest

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Glade Substation
PN-2024-013 · s3631.1
Not printed $12 M 12/17/2027 Not printed 2025-10-08
TEAC
Forest - Glade 230 kV FG Line
PN-2024-014 · s4018.1
Not printed $ 156.72M 05/31/2029 Not printed 2026-10-06
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Penelec Local Plan Submission of Supplemental Projects for 2026 p. 37
Forest - Glade 230 kV FG Line “Rebuild approximately 34.1 miles of 230 kV line from Forest Substation to structure 288”
230 kV
2026-10-01* SRRTEP Mid-Atlantic
Penelec local plan submission for 2026 RTEP p. 37
Forest - Glade 230 kV FG Line “Rebuild approximately 34.1 miles of 230 kV line from Forest Substation”
2026-09-08* SRRTEP Mid-Atlantic
Penelec local plan submission for 2025 RTEP p. 16
Glade Substation “At Forest Substation, on the Glade line terminal: ▪ Install new relaying and control equipment.”
230 kV
2025-10-08 TEAC
Informational Only - Penelec Local Plan Submission of the Supplemental Projects for 2025 p. 16
Glade Substation “At Forest Substation, on the Glade line terminal: § Install new relaying and control equipment.”
2025-10-08 TEAC
Item 06 - Penelec Supplemental Projects p. 6
Forest - Glade 230 kV FG Line “Rebuild approximately 34.1 miles of 230 kV line from Forest Substation”
230 kV
2025-03-04 TEAC
Item 07 - Penelec Supplemental Projects p. 4
Glade Substation “At Forest Substation, on the Glade line terminal: -Install new relaying and control equipment”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.