Allen Junction Substation
Named in 4 PJM planning documents for 2 projects, from December 8, 2025 to October 16, 2026.
PJM interconnection queue
A PJM queue substation page has the same name: Allen Junction (OH) — 3 queue requests filed, 0 active.
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Westgate Station 138 kV ATSI-2024-009 |
Conceptual | $3.8 M | 05/26/2028 | Not printed | 2026-10-16 SRRTEP Western |
| Lallendorf Substation Upgrades for MISO Tranche 2.1 ATSI-2025-005 · s3845.1 |
Not printed | $7.21 | 6/1/2032 | Not printed | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Cost estimate | $5.9 M → $7.21 M | 2025-03-04 | 2025-12-08 |
| Cost estimate | $7.21 M → $7.21 | 2025-12-08 | 2026-10-06 |
| Substations named | LALLENDORF; LAPLAISANCE CREEK; MONROE → LALLENDORF | 2025-02-04 | 2025-03-04 |
| Substations named | LALLENDORF → ALLEN JUNCTION; LALLENDORF; MOROCCO | 2025-03-04 | 2025-12-08 |
| Substations named | ALLEN JUNCTION; LALLENDORF; MOROCCO → ALLEN JUNCTION; LALLENDORF | 2025-12-08 | 2026-10-06 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-16 | SRRTEP Western Item 02 - ATSI Supplemental Projects Presentation p. 9 |
Westgate Station 138 kV | “Circuit Breakers B-13374 at Allen Junction Substation” |
| 2026-10-06 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2026 p. 21 |
Lallendorf Substation Upgrades for MISO Tranche 2.1 | “At Allen Junction Substation, replace disconnect switches, breaker leads, metering, and transmission line drops.” |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 21 |
Lallendorf Substation Upgrades for MISO Tranche 2.1 | “At Allen Junction Substation, replace disconnect switches, breaker leads, metering, and transmission line drops.” |
| 2025-12-08 | TEAC Item 04 - ATSI Supplemental Projects p. 7 |
Lallendorf Substation Upgrades for MISO Tranche 2.1 | “At Allen Junction Substation, replace disconnect switches” 345 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.