Mentions: January 2026
Each row is one PJM document naming substations for one project, newest first. Atom feed
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
| Date | Document | Project | Substations named | As printed |
|---|---|---|---|---|
| 2026-01-16 | SRRTEP Western Item 01 - AEP supplemental projects p. 3 |
AEP Transmission Zone: Supplemental
S2888 Scope Change AEP-2022-IM008 · S2888 |
Adams Berne |
Cost $19.45M In service 2/13/2029 |
| 2026-01-16 | SRRTEP Western Item 01 - AEP supplemental projects p. 5 |
Buchanan South, MI AEP-2026-IM001 |
Buchanan South | No figures printed |
| 2026-01-16 | SRRTEP Western Item 01 - AEP supplemental projects p. 6 |
Progress Park, VA AEP-2026-AP001 |
None named | In service Q1 2027 Load 240MW |
| 2026-01-16 | SRRTEP Western Item 01 - AEP supplemental projects p. 7 |
Bixby, OH/Beatty, OH AEP-2026-OH001 |
Cyprus | In service Q2 2027 Load 675 MW |
| 2026-01-16 | SRRTEP Western Item 01 - AEP supplemental projects p. 9 |
Haverhill, Ohio AEP-2022-OH002 |
North Haverhill | Status Conceptual Cost $12.985 M In service 03/01/2027 |
| 2026-01-16 | SRRTEP Western Item 01 - AEP supplemental projects p. 11 |
Lazelle, OH/Bush, OH AEP-2025-OH002 |
Busch Sancus Switch New |
Status Engineering Cost $4.44 M In service 12/28/2027 |
| 2026-01-16 | SRRTEP Western Item 01 - AEP supplemental projects p. 13 |
Hannibal, WV AEP-2025-OH012 |
Hannibal | Status Engineering Cost $1.875 M In service 10/26/2026 Load 570 MW |
| 2026-01-16 | SRRTEP Western Item 02 - AMPT Supplemental Projects p. 3 |
Bryan-Edgerton 69 kV AMPT-2026-001 |
Edgerton substation | No figures printed |
| 2026-01-16 | SRRTEP Western Item 02 - AMPT Supplemental Projects p. 5 |
Niles Central 138 kV substation AMPT-2025-005 |
McDonald Steel Niles Niles Central |
Status Pre-Engineering (Engineering) Cost $14.1M In service 08/01/2028 Load 63 MW |
| 2026-01-16 | SRRTEP Western Item 03 - APS Supplemental Projects p. 3 |
Smithton 138 kV Substation APS-2026-001 |
Allenport Charleroi Iron Bridge Mitchell Smithton Substation Yukon |
Load 10 MW |
| 2026-01-16 | SRRTEP Western Item 03 - APS Supplemental Projects p. 4 |
Misoperation Relay Projects APS-2026-002 |
Glenville Goff Run Substation Grantsville |
No figures printed |
| 2026-01-16 | SRRTEP Western Item 03 - APS Supplemental Projects p. 5 |
Joffre 138 kV Substation APS-2026-003 |
Joffre Substation | In service 05/27/2027 |
| 2026-01-16 | SRRTEP Western Item 03 - APS Supplemental Projects p. 6 |
Bredinville - McCalmont 138 kV Line APS-2026-004 |
Bredinville McCalmont |
In service 3/15/2028 Load 80 MW |
| 2026-01-16 | SRRTEP Western Item 03 - APS Supplemental Projects p. 8 |
Loughs Lane - Pickens 138 kV Line APS-2025-016 |
Loughs Lane Substation Pickens |
Status Conceptual Cost $1.05M In service 12/31/2026 |
| 2026-01-16 | SRRTEP Western Item 03 - APS Supplemental Projects p. 10 |
Glenville - Weston 138 kV Line APS-2024-074 |
Glenville Weston Substation |
Status Conceptual Cost $89.52M In service 12/15/2030 |
| 2026-01-16 | SRRTEP Western Item 04 - ATSI Supplemental Projects p. 3 |
Abbe - Carlisle No. 1 and No. 2 69 kV lines ATSI-2026-001 |
Abbe Carlisle Johnson Robson |
Load 9 MW |
| 2026-01-16 | SRRTEP Western Item 04 - ATSI Supplemental Projects p. 4 |
Bulk Mail Facility 138 kV ATSI-2026-002 |
Bulk Mail Facility Fernway Tap Pine |
No figures printed |
| 2026-01-16 | SRRTEP Western Item 04 - ATSI Supplemental Projects p. 5 |
Crestline 69 kV Capacitor ATSI-2026-003 |
Crestline Station Leaside Stevens |
No figures printed |
| 2026-01-16 | SRRTEP Western Item 04 - ATSI Supplemental Projects p. 6 |
Dale 138 kV Substation ATSI-2026-004 |
Dale Moore South Akron Strobel Substation |
Load 56 MW |
| 2026-01-16 | SRRTEP Western Item 04 - ATSI Supplemental Projects p. 7 |
Dixie 69 kV Substation ATSI-2026-005 |
Dixie Substation Omni Perstorp Polyols Teledyne |
No figures printed |
| 2026-01-16 | SRRTEP Western Item 04 - ATSI Supplemental Projects p. 8 |
East Springfield station ATSI-2026-006 |
Benjamin T Branch East Springfield North Titus |
No figures printed |
| 2026-01-16 | SRRTEP Western Item 04 - ATSI Supplemental Projects p. 9 |
Eber 138 kV Substation ATSI-2026-007 |
Eber Substation Swanton Wentworth |
Load 43 MW |
| 2026-01-16 | SRRTEP Western Item 04 - ATSI Supplemental Projects p. 10 |
Genoa - Maclean 69 kV Line ATSI-2026-008 |
Genoa Maclean |
No figures printed |
| 2026-01-16 | SRRTEP Western Item 04 - ATSI Supplemental Projects p. 11 |
Gilchrist - Hartville 69 kV ATSI-2026-009 |
Burger Iron Burger Iron Tap Burger Rubbermaid Tap Gilchrist Goodyear Wingfoot Goodyear Wingfoot Tap Hartville Omnova Tap Rubbermaid Trelleborg Wheel |
No figures printed |
| 2026-01-16 | SRRTEP Western Item 04 - ATSI Supplemental Projects p. 13 |
Pemberville 69 kV breakers ATSI-2026-013 |
Bowling Green No. 4 Hancock Wood Tap Maclean Pemberville Station |
No figures printed |
| 2026-01-16 | SRRTEP Western Item 04 - ATSI Supplemental Projects p. 14 |
Toussaint 138 kV Substation ATSI-2026-014 |
Bayshore Brush Wellman Davis Besse Ottawa Toussaint Substation |
Load 25 MW |
| 2026-01-16 | SRRTEP Western Item 04 - ATSI Supplemental Projects p. 16 |
Cascade (Cedar Street) 69 kV Line ATSI-2022-001 · s3495.1 |
Blair Strip Steel Cascade Cedar St Cedar Street Hillcrest New Wilmington Public Welfare Ray St Walmo YDC- West Tap |
Status Conceptual Cost $34.7 M In service 3/31/2028 |
| 2026-01-16 | SRRTEP Western Item 05 - ComEd Supplemental Projects p. 3 |
Belvidere 138KV BT3-4 and L12205 Relays ComEd-2026-001 |
Belvidere Marengo |
No figures printed |
| 2026-01-16 | SRRTEP Western Item 05 - ComEd Supplemental Projects p. 5 |
NIPSCO Customer in Chicago ComEd-2025-027 |
State Line Wolf Lake |
Status Engineering Cost $ 0M In service 6/1/2027 Load 260 MW |
| 2026-01-16 | SRRTEP Western Item 06 - SRRTEP West - Reliability Analysis Update p. 3 |
Huntington Court 69kV Breaker CS-XT4 Replacement B3975.2 |
Catawba Huntington Court |
Cost $1.0 M In service 6/1/2030 |
| 2026-01-15 | SRRTEP Mid-Atlantic Item 01 - BGE Supplemental Projects p. 3 |
Triple Bridges BGE-2026-001 |
None named | Load 150 MW |
| 2026-01-15 | SRRTEP Mid-Atlantic Item 02 - JCPL Supplemental Projects p. 3 |
Morris Court 34.5 kV Substation – Customer Interconnection, NJ JCPL-2025-011 |
Briant Park Morris Court Substation Traynor |
Status Conceptual Cost $110,000 In service 09/14/2026 Load approximately 10 MW |
| 2026-01-15 | SRRTEP Mid-Atlantic Item 03 - PPL Supplemental Projects p. 3 |
PPL Transmission Zone: Supplemental
Watson, PA PPL-2026-0005 |
Watson | In service 4/1/2027 |
| 2026-01-15 | SRRTEP Mid-Atlantic Item 03 - PPL Supplemental Projects p. 4 |
PPL Transmission Zone: Supplemental
West Berwick, PA PPL-2026-0007 |
West Berwick | In service 11/30/2028 |
| 2026-01-15 | SRRTEP Mid-Atlantic Item 03 - PPL Supplemental Projects p. 5 |
PPL Transmission Zone: Supplemental
Fairfield, PA PPL-2026-0008 |
Fairfield | In service 10/8/2028 |
| 2026-01-15 | SRRTEP Mid-Atlantic Item 04 - UGI Supplemental Projects p. 3 |
UGI-2026-0001 | Hunlock Creek Substation | In service Q4 of 2027 Load 200MW |
| 2026-01-15 | SRRTEP Mid-Atlantic Item 04 - UGI Supplemental Projects p. 4 |
UGI-2026-0002 | Swoyersville | No figures printed |
| 2026-01-15 | SRRTEP Mid-Atlantic Item 06 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 4 |
ACE Transmission Zone: Baseline
b3737.24 and B3737.25 Cancellation: Cardiff – Lewis 138kV b3737.24 and B3737.25 |
Cardiff Lewis |
Status Cancelled |
| 2026-01-15 | SRRTEP Southern Item 05 - DOM Supplemental Projects p. 3 |
Equipment Material Condition, Performance and Risk DOM-2025-0074 |
Moon Corner Northern Neck Rappahannock |
No figures printed |
| 2026-01-15 | SRRTEP Southern Item 05 - DOM Supplemental Projects p. 5 |
Operational Flexibility and Efficiency DOM-2022-0061 (Update) |
Alexander Corner Brown Boveri Deep Creek Quantico Tunis |
Status Engineering Cost $1.86M In service 12/31/2026 |
| 2026-01-06 | TEAC Item 02 - APS Supplemental Projects p. 3 |
Yukon No. 7 500/138 kV Transformer APS-2025-030 |
Yukon | Status Engineering Cost $0.41M In service 12/31/2026 |
| 2026-01-06 | TEAC Item 03 - JCPL Supplemental Projects p. 3 |
Manchester 230-34.5 kV Substation JCPL-2026-001 |
Cookstown Larrabee Manchester Whitings |
Load 23 MW |
| 2026-01-06 | TEAC Item 04 - Penelec Supplemental Projects p. 3 |
Keystone 500/230 kV No. 4 Transformer PN-2026-002 |
Keystone | No figures printed |
| 2026-01-06 | TEAC Item 05 - ACE Supplemental Projects p. 3 |
ACE-2026-001 | None named | Load 49 MW |
| 2026-01-06 | TEAC Item 06 - PECO Supplemental Projects p. 3 |
PE-2026-001 | Newlinville | No figures printed |
| 2026-01-06 | TEAC Item 06 - PECO Supplemental Projects p. 4 |
PE-2026-002 | Buxmont Whitpain |
No figures printed |
| 2026-01-06 | TEAC Item 07 - DOM Supplemental Projects p. 3 |
Customer Load Request DOM-2025-0030 |
Sunset Hill Substation | In service December 31, 2028 Load 100 MW |
| 2026-01-06 | TEAC Item 07 - DOM Supplemental Projects p. 4 |
Customer Load Request DOM-2025-0031 |
Elm Farm Substation | In service December 31, 2027 Load 69 MW |
| 2026-01-06 | TEAC Item 07 - DOM Supplemental Projects p. 5 |
Customer Load Request DOM-2025-0078 |
Barrister Substation | In service May 31, 2029 Load 290 MW |
| 2026-01-06 | TEAC Item 07 - DOM Supplemental Projects p. 6 |
Customer Load Request DOM-2025-0098 |
Quantico New | In service 12/31/2029 Load 30.3 MW |
| 2026-01-06 | TEAC Item 07 - DOM Supplemental Projects p. 7 |
Customer Load Request DOM-2026-0001 |
Correctional | In service 12/31/2028 Load 41.3 MW |
| 2026-01-06 | TEAC Item 07 - DOM Supplemental Projects p. 8 |
DOM-2025-0073 | Correctional Goalder’s Creek Harmony Village Substation Lanexa Owl Trap Paper Mill Shackleford West Point |
No figures printed |
| 2026-01-06 | TEAC Item 07 - DOM Supplemental Projects p. 10 |
Hanover 230 kV Delivery – TX Upgrade - DEV DOM-2025-0017 |
Hanover | Status Engineering Cost $1.5M In service 12/31/2026 |
| 2026-01-06 | TEAC Item 07 - DOM Supplemental Projects p. 12 |
West Creek 230kV Delivery - DEV DOM-2025-0054 |
Midlothian North Pole Rockville Short Pump West Creek New |
Status Planning (Conceptual) Cost $35M In service 07/26/2028 Load 100 MW |
| 2026-01-06 | TEAC Item 07 - DOM Supplemental Projects p. 14 |
Shaw 230kV Delivery - REC DOM-2025-0070 |
Kyser Remington Shaw New |
Status Planning (Conceptual) Cost $32M In service 5/1/2028 Load 300 MW |
| 2026-01-06 | TEAC Item 07 - DOM Supplemental Projects p. 16 |
Frances 230kV Delivery - REC DOM-2025-0071 |
Frances New Southall |
Status Planning (Conceptual) Cost $21M In service 8/01/2027 Load 176 MW |
| 2026-01-06 | TEAC Item 07 - DOM Supplemental Projects p. 18 |
Do No Harm Analysis DOM-2025-0071-DNH |
Foxbrook Lane substation Frances Gordonsville N Anna North Anna Southall |
Status Planning (Conceptual) Cost $12M In service 12/30/2028 |
| 2026-01-06 | TEAC Item 07 - DOM Supplemental Projects p. 20 |
Wesbey Drive 230kV Delivery - REC DOM-2025-0072 |
Foxbrook Lane substation Wesbey Drive New |
Status Planning (Conceptual) Cost $21M In service 3/01/2029 Load 292 MW |
| 2026-01-06 | TEAC Item 07 - DOM Supplemental Projects p. 22 |
Do No Harm Analysis DOM-2019-0021, DOM-2024-0022, DOM-2024-0023, DOM-2024-0024 - DNH |
Bermuda Hundred New Chickahominy Enon substation Meadowville New Shand Creek New Sycamore Springs New |
Status Engineering Cost $95.1M In service Q4 2028 |
| 2026-01-06 | TEAC Item 09 - Reliability Analysis Update p. 13 |
Woodsdale 345 kV Reliability & Reconfigure b3940.1 |
Todhunter Woodsdale |
Cost $36.818 M In service 11/16/2028 |
| 2026-01-06 | TEAC Item 09 - Reliability Analysis Update p. 15 |
Montville 500/230 kV Substation b4032.1 |
Hopatcong Iliff Montville Roseland Whippany |
Cost $98.10 M In service 11/1/2029 |
| 2026-01-06 | TEAC Item 09 - Reliability Analysis Update p. 17 |
PPL Cluster B4029.18 |
Kelayres Susquehanna |
Cost $4.5 M In service 6/1/2030 |
| 2026-01-06 | TEAC Item 09 - Reliability Analysis Update p. 21 |
MAAC Regional Cluster: Baseline b4036.1 |
Belmont Buttermilk Falls Conemaugh Juniata Kammer Keystone Mountain Stone Mountaineer South Bend Sunbury |
Cost $1789.39M In service 6/1/2032 |
| 2026-01-06 | TEAC Item 09 - Reliability Analysis Update p. 24 |
Exelon/PEPCO Cluster b4052.1 |
Aspen Bells Mill Brighton Dickerson New Quince Orchard Rocky Point |
Cost $282.16 M In service 6/1/2032 |
| 2026-01-06 | TEAC Item 09 - Reliability Analysis Update p. 27 |
Regional Solution: 2025-W1-275 Portfolio b4053.1 |
Burches Hill Carson Celestial Chickahominy Clifton Cunningham Elmont Heritage New Kraken New Midlothian Mosby North Anna Possum Point Surry Vint Hill Vontay New Wishing Star Yeat |
Cost $4832.45 In service 6/1/2032 |
| 2026-01-06 | TEAC Item 09 - Reliability Analysis Update p. 44 |
West Cluster Recommended Selection (2nd Read) b4068.1 |
Adkins New Allen Beatty Bethel Bixby Cole Conesville New Greentown Guernsey Hayden Hess Hyatt Kirk Maliszewski Marysville Meadow Lake Newark Center Ohio Central OSU South Kenton Teddy New West Millersport New |
Cost $2,768.0M In service 10/1/2032 |
| 2026-01-06 | TEAC Item 09 - Reliability Analysis Update p. 63 |
Richmond-Waneeta 230 kV Underground Rebuild b3737.23 |
None named | Status Cancellation (Cancelled) Cost $16 M In service 6/1/2029 |
| 2026-01-06 | TEAC Item 09 - Reliability Analysis Update p. 64 |
Ringgold 138 kV Breaker “138 BUS TIE” Replacement b3983.1 |
Ringgold | Status Cancellation (Cancelled) Cost $0.957M In service 6/1/2030 |
| 2026-01-06 | TEAC Item 09 - Reliability Analysis Update p. 66 |
NextEra MidAtlantic Resiliency Link ‘MARL’ Project Summary b3800.102 |
502 Junction Bismark Black Oak Doubs Gore Stonewall Woodside New |
Cost $844.80M In service December 2028 |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.