Morris Park
Named in 6 PJM planning documents for 7 projects, from November 6, 2024 to September 17, 2026.
Also printed as: Morris Park Substation
PJM interconnection queue
A PJM queue substation page has the same name: Morris Park (NJ) — 4 queue requests filed, 0 active.
Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| JCPL Transmission Zone M-3 Process Morris Park Substation JCPL-2023-011 · s3611.1 |
Not printed | $15.4M | 1/29/2027 | 13 MW | 2025-10-08 TEAC |
| Gilbert Substation JCPL-2023-043 · s3256.1 |
Not printed | $2.4M | 05/30/2024 | Not printed | 2026-09-08* SRRTEP Mid-Atlantic |
| Misoperation Relay Project JCPL-2024-007 · s3327.1 |
Not printed | $ 3.27M | 12/17/2026 | Not printed | 2026-09-08* SRRTEP Mid-Atlantic |
| JCPL Transmission Zone M-3 Process Gilbert No. 2 and No. 3 115-34.5-13.2 kV Transformers JCPL-2024-027 · s3616.1 |
Not printed | $8M | 12/31/2028 | Not printed | 2026-09-08* SRRTEP Mid-Atlantic |
| Gilbert - Pequest River 115 kV Line Rebuild JCPL-2024-039 |
Conceptual | $81.55 M | 06/29/2029 | Not printed | 2026-09-17 SRRTEP Mid-Atlantic |
| Morris Park Substation - 34.5 kV Breakers, NJ JCPL-2026-038 |
Conceptual | $7.13 M | 12/21/2028 | Not printed | 2026-09-17 SRRTEP Mid-Atlantic |
| Phillipsburg Substation JCPL-2026-044 |
Not printed | Not printed | Not printed | Not printed | 2026-09-17 SRRTEP Mid-Atlantic |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | GILBERT → GILBERT; GLENDON; MORRIS PARK | 2025-10-08 | Not reported |
| Substations named | CAPTIVE PLACE TAP; MARBLE HILL; MORRIS PARK; PHILIPSBURG; RAND BLVD; WARREN GLEN SWPT → MARBLE HILL; MORRIS PARK; PHILIPSBURG; WARREN GLEN SWPT | 2026-07-17 | 2026-09-17 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-09-17 | SRRTEP Mid-Atlantic Item 01 - JCPL Supplemental Projects p. 18 |
Gilbert - Pequest River 115 kV Line Rebuild | “At Morris Park Substation: Replace CCVT.” 115 kV |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 01 - JCPL Supplemental Projects p. 37 |
Morris Park Substation - 34.5 kV Breakers, NJ | “At the Morris Park Substation, replace the W23A, W23B, F6, S123, X24, T124, BK3B, and BK3A 34.5 kV OCBs” 34.5 kV |
| 2026-09-17 | SRRTEP Mid-Atlantic Item 01 - JCPL Supplemental Projects p. 8 |
Phillipsburg Substation | No role wording 34.5 kV |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2025 RTEP p. 21 |
JCPL Transmission Zone M-3 Process Gilbert No. 2 and No. 3 115-34.5-13.2 kV Transformers | No role wording |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2025 RTEP p. 5 |
JCPL Transmission Zone M-3 Process Morris Park Substation | “Convert Morris Park 230 kV Substation into a four-breaker ring bus” 230 kV |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 27 |
Gilbert Substation | No role wording 230 kV |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 67 |
Misoperation Relay Project | No role wording 115 kV |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 02 - JCPL Supplemental Projects p. 3 |
Morris Park Substation - 34.5 kV Breakers, NJ | “At Morris Park Substation the existing 34.5 kV breakers” 34.5 kV |
| 2025-10-08 | TEAC Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 5 |
JCPL Transmission Zone M-3 Process Morris Park Substation | “Convert Morris Park 230 kV Substation into a four-breaker ring bus” 230 kV |
| 2024-11-06 | TEAC Item 05 - JCPL Supplemental Projects p. 3 |
JCPL Transmission Zone M-3 Process Morris Park Substation | “The existing 230 kV and 115 kV sources to Morris Park Substation are fed radially.” 230 kV and 115 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.