Substation Scout

Morris Park

Named in 6 PJM planning documents for 7 projects, from November 6, 2024 to September 17, 2026.

Existingdescribed as
JCPLzone
115 kV, 230 kV, 230 kV and 115 kV, 34.5 kVkV as printed
10mentions

Also printed as: Morris Park Substation

PJM interconnection queue

A PJM queue substation page has the same name: Morris Park (NJ) — 4 queue requests filed, 0 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
JCPL Transmission Zone M-3 Process Morris Park Substation
JCPL-2023-011 · s3611.1
Not printed $15.4M 1/29/2027 13 MW 2025-10-08
TEAC
Gilbert Substation
JCPL-2023-043 · s3256.1
Not printed $2.4M 05/30/2024 Not printed 2026-09-08*
SRRTEP Mid-Atlantic
Misoperation Relay Project
JCPL-2024-007 · s3327.1
Not printed $ 3.27M 12/17/2026 Not printed 2026-09-08*
SRRTEP Mid-Atlantic
JCPL Transmission Zone M-3 Process Gilbert No. 2 and No. 3 115-34.5-13.2 kV Transformers
JCPL-2024-027 · s3616.1
Not printed $8M 12/31/2028 Not printed 2026-09-08*
SRRTEP Mid-Atlantic
Gilbert - Pequest River 115 kV Line Rebuild
JCPL-2024-039
Conceptual $81.55 M 06/29/2029 Not printed 2026-09-17
SRRTEP Mid-Atlantic
Morris Park Substation - 34.5 kV Breakers, NJ
JCPL-2026-038
Conceptual $7.13 M 12/21/2028 Not printed 2026-09-17
SRRTEP Mid-Atlantic
Phillipsburg Substation
JCPL-2026-044
Not printed Not printed Not printed Not printed 2026-09-17
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named GILBERT → GILBERT; GLENDON; MORRIS PARK 2025-10-08 Not reported
Substations named CAPTIVE PLACE TAP; MARBLE HILL; MORRIS PARK; PHILIPSBURG; RAND BLVD; WARREN GLEN SWPT → MARBLE HILL; MORRIS PARK; PHILIPSBURG; WARREN GLEN SWPT 2026-07-17 2026-09-17

Every mention

DateDocumentProjectWhat the document says about it
2026-09-17 SRRTEP Mid-Atlantic
Item 01 - JCPL Supplemental Projects p. 18
Gilbert - Pequest River 115 kV Line Rebuild “At Morris Park Substation: Replace CCVT.”
115 kV
2026-09-17 SRRTEP Mid-Atlantic
Item 01 - JCPL Supplemental Projects p. 37
Morris Park Substation - 34.5 kV Breakers, NJ “At the Morris Park Substation, replace the W23A, W23B, F6, S123, X24, T124, BK3B, and BK3A 34.5 kV OCBs”
34.5 kV
2026-09-17 SRRTEP Mid-Atlantic
Item 01 - JCPL Supplemental Projects p. 8
Phillipsburg Substation No role wording
34.5 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2025 RTEP p. 21
JCPL Transmission Zone M-3 Process Gilbert No. 2 and No. 3 115-34.5-13.2 kV Transformers No role wording
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2025 RTEP p. 5
JCPL Transmission Zone M-3 Process Morris Park Substation “Convert Morris Park 230 kV Substation into a four-breaker ring bus”
230 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 27
Gilbert Substation No role wording
230 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 67
Misoperation Relay Project No role wording
115 kV
2026-07-17 SRRTEP Mid-Atlantic
Item 02 - JCPL Supplemental Projects p. 3
Morris Park Substation - 34.5 kV Breakers, NJ “At Morris Park Substation the existing 34.5 kV breakers”
34.5 kV
2025-10-08 TEAC
Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 5
JCPL Transmission Zone M-3 Process Morris Park Substation “Convert Morris Park 230 kV Substation into a four-breaker ring bus”
230 kV
2024-11-06 TEAC
Item 05 - JCPL Supplemental Projects p. 3
JCPL Transmission Zone M-3 Process Morris Park Substation “The existing 230 kV and 115 kV sources to Morris Park Substation are fed radially.”
230 kV and 115 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.