Bremo

Named in 9 PJM planning documents for 7 projects, from December 12, 2024 to October 6, 2026.

Existingdescribed as
DOMzone
138/115kV, 230 kV, 230kVkV as printed
9mentions

Also printed as: Bremo Sub

PJM interconnection queue

A PJM queue substation page has the same name: Bremo (VA) — 4 queue requests filed, 3 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dominion Transmission Zone: Baseline Charlottesville – Fork Union – Bremo 230 kV
b4030.9
Not printed $127.05 M 6/1/2030 Not printed 2025-12-08
TEAC
DOM Transmission Zone: Baseline Bremo to Fork Union 115kV
b4031.1
Not printed $7M 6/1/2030 Not printed 2025-12-11
SRRTEP Southern
Bremo 138/115kV Transformer #8 Cancelled $.092M 6/1/2029 Not printed 2024-12-12
SRRTEP Southern
Bremo to Fork Union 115kV Not printed $7M 6/1/2030 Not printed 2025-11-13
SRRTEP Southern
Dominion Transmission Zone: Supplemental Do No Harm Analysis
DOM-2024-0036-DNH (Update)
Conceptual $212M Q4 2031 Not printed 2026-10-06
TEAC
Equipment Material Condition, Performance and Risk
DOM-2026-0019
Conceptual $96M 07/30/2030 Not printed 2026-09-08
TEAC
Hopewell – Chesterfield – Basin 230 kV
2025-W1-911
Not printed $113.55 M 6/1/2030 Not printed 2025-11-04
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named BREMO; FARMVILLE → BREMO; FARMVILLE; FORK UNION 2026-05-08 2026-09-08

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Item 14 - DOM Supplemental Projects - Presentation p. 6
Dominion Transmission Zone: Supplemental Do No Harm Analysis “Midlothian-Bremo to current 230 kV standards”
230 kV
2026-09-08 TEAC
Item 10 - DOM Supplemental Projects p. 8
Equipment Material Condition, Performance and Risk “rebuild the existing #298 transmission line from Farmville to Bremo Substation”
2026-07-07 TEAC
Item 14 - DOM Supplemental Projects p. 9
Dominion Transmission Zone: Supplemental Do No Harm Analysis No role wording
2026-05-08 TEAC
Item 09 - DOM Supplemental Projects p. 3
Equipment Material Condition, Performance and Risk No role wording
2025-12-11 SRRTEP Southern
Item 03 - SRRTEP South - Reliability Analysis Update p. 4
DOM Transmission Zone: Baseline Bremo to Fork Union 115kV “Upgrade all relevant substation equipment at Bremo substation”
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 24
Dominion Transmission Zone: Baseline Charlottesville – Fork Union – Bremo 230 kV “Uprate all Line #2193 terminal equipment, line leads, and bus at Bremo substation”
230kV
2025-11-13 SRRTEP Southern
Item 02 - SRRTEP South - Reliability Analysis Update p. 4
Bremo to Fork Union 115kV “Upgrade all relevant substation equipment at Bremo and Fork Union substations”
2025-11-04 TEAC
Item 14 - Reliability Analysis Update p. 33
Hopewell – Chesterfield – Basin 230 kV “Uprate all Line #2193 terminal equipment, line leads, and bus at Fork Union and Bremo substations”
230kV
2024-12-12 SRRTEP Southern
Item 01 - SRRTEP South - Reliability Analysis Update p. 12
Bremo 138/115kV Transformer #8 “Upgrade the 795AAC high side and low side leads as to not limit the Bremo Transformer #8 rating.”
138/115kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.