South Reading Substation

Named in 6 PJM planning documents for 7 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
METEDzone
230 kV, 230 – 69 kV, 230-69 kV, 69 kVkV as printed
16mentions

Also printed as: South Reading

PJM interconnection queue

A PJM queue substation page has the same name: South Reading (PA) — 3 queue requests filed, 0 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Carpenter Technology – South Reading 69 kV Line
ME-2019-043 · s3288.1
Not printed $15.2M 05/29/2026 Not printed 2024-10-08
TEAC
Birdsboro – Birdsboro Extrusions 69 kV Line
ME-2023-011 · s3289.1
Not printed $2.1M 12/10/2025 Not printed 2024-10-08
TEAC
South Reading Substation
ME-2023-021 · s3331.1
Not printed $9.85M 6/1/2025 Not printed 2024-10-08
TEAC
South Reading 230-69 kV Transformer #7
ME-2023-023 · s3332.1
Not printed $6.10 M 12/31/2026 Not printed 2024-10-08
TEAC
South Reading 230-69 kV Transformer #8
ME-2023-024 · s3333.1
Not printed $6.10 M 12/31/2026 Not printed 2024-10-08
TEAC
South Reading Substation
ME-2023-025 · s3742.1
Not printed $20.4M 11/15/2027 Not printed 2026-10-06
TEAC
South Reading - West Reading 69 kV Line
ME-2024-002 · s3975.1
Not printed $17.10M 12/29/2028 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $6.10 M → $8.80M 2024-10-08 Not reported
In-service date 12/31/2026 → 6/1/2025 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-10-07* SRRTEP Mid-Atlantic
Met-Ed local plan submission for 2026 RTEP p. 15
South Reading - West Reading 69 kV Line “South Reading: Replace relaying for 69 kV Circuit Breaker 2642.”
2026-10-07* SRRTEP Mid-Atlantic
Met-Ed local plan submission for 2026 RTEP p. 5
South Reading Substation “At South Reading Substation: ▪ Install a new No. 9 230-69 kV 224 MVA transformer”
2026-10-06 TEAC
Informational Only - MetEd Local Plan Submission of Supplemental Projects for 2026 p. 14
South Reading - West Reading 69 kV Line “South Reading: Replace relaying for 69 kV Circuit Breaker 2642”
2026-10-06 TEAC
Informational Only - MetEd Local Plan Submission of Supplemental Projects for 2026 p. 4
South Reading Substation “At South Reading Substation:”
2026-09-08* SRRTEP Mid-Atlantic
Met-Ed local plan submission for 2024 RTEP p. 13
Carpenter Technology – South Reading 69 kV Line “At South Reading Substation:  Replace 69 kV breaker, line-side disconnect and line relaying”
69 kV
2026-09-08* SRRTEP Mid-Atlantic
Met-Ed local plan submission for 2024 RTEP p. 16
Birdsboro – Birdsboro Extrusions 69 kV Line “At South Reading Substation:  Adjust relay settings”
2026-09-08* SRRTEP Mid-Atlantic
Met-Ed local plan submission for 2024 RTEP p. 19
South Reading Substation “Convert South Reading 230 kV into a ten (10) breaker Double Breaker – Double Bus configuration.”
230 kV
2026-09-08* SRRTEP Mid-Atlantic
Met-Ed local plan submission for 2024 RTEP p. 21
South Reading 230-69 kV Transformer #7 “Replace the existing #7 bank 230/69 kV with a 230/69 kV, 135/180/224 MVA transformer”
230-69 kV
2026-09-08* SRRTEP Mid-Atlantic
Met-Ed local plan submission for 2024 RTEP p. 23
South Reading 230-69 kV Transformer #8 “Replace the existing South Reading 230-69 kV #8 Transformer”
230-69 kV
2026-03-18 SRRTEP Mid-Atlantic
Item 07 - MetEd Supplemental Projects p. 6
South Reading - West Reading 69 kV Line “South Reading: Replace relaying for 69 kV Circuit Breaker 2642.”
69 kV
2025-08-05 TEAC
Item 05 - MetEd Supplemental Projects p. 3
South Reading Substation “At South Reading Substation: § Install a new No. 9 230-69 kV 224 MVA transformer”
230 – 69 kV
2024-10-08 TEAC
Informational Only - METED Local Plan submission of supplemental project 2024 p. 14
Carpenter Technology – South Reading 69 kV Line “At South Reading Substation: § Replace 69 kV breaker”
69 kV
2024-10-08 TEAC
Informational Only - METED Local Plan submission of supplemental project 2024 p. 16
Birdsboro – Birdsboro Extrusions 69 kV Line “At South Reading Substation: § Adjust relay settings”
2024-10-08 TEAC
Informational Only - METED Local Plan submission of supplemental project 2024 p. 19
South Reading Substation “Convert South Reading 230 kV into a ten (10) breaker Double Breaker – Double Bus configuration.”
230 kV
2024-10-08 TEAC
Informational Only - METED Local Plan submission of supplemental project 2024 p. 21
South Reading 230-69 kV Transformer #7 “Replace the existing #7 bank 230/69 kV with a 230/69 kV, 135/180/224 MVA transformer”
230-69 kV
2024-10-08 TEAC
Informational Only - METED Local Plan submission of supplemental project 2024 p. 23
South Reading 230-69 kV Transformer #8 “Replace the existing #8 bank 230/69 kV with a 230/69 kV, 135/180/224 MVA transformer”
230-69 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.