Iron Bridge

Named in 4 PJM planning documents for 4 projects, from October 8, 2024 to July 17, 2026.

Existingdescribed as
APSzone
138 kVkV as printed
6mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Stoner Junction 138 kV Line
APS-2023-006 · s3123.1
Not printed $ 31.5 M 12/31/2025 Not printed 2024-10-08
TEAC
Misoperation Relay Projects
APS-2024-008, APS-2024-011, APS-2024-013, APS-2024-015, APS-2024-016, APS-2024-024, APS-2024-030 to APS-2024-034 · s3470.1, s3471.1, s3472.1, s3473.1, s3474.1, s3475.1, s3476.1, s3477.1, s3478.1, s3479.1, s3480.1
Not printed Not printed Not printed Not printed 2024-10-08
TEAC
Misoperation Relay Projects
APS-2024-016, APS-2024-024, APS-2024-030, APS-2024-031 · s3474.1, s3475.1, s3476.1, s3477.1
Not printed Not printed Not printed Not printed 2026-09-08*
SRRTEP Western
Smithton 138 kV Substation
APS-2026-001
Conceptual $11.52 M 12/17/2027 10 MW 2026-07-17
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named ANTIETAM; BEDINGTON; BELMONT; BETHELBORO; CARNEGIE; CHARLEROI; DONEGAL; E HAGERSTOWN; EAST HAGERSTOWN; EDGELAWN; HAMPSHIRE; IRON BRIDGE; MARLOWE; PAPER CITY; RENO TAP; RIDGELEY; RIDGWAY; TIDD; TRISSLER; WEIRTON; YUKON → ANTIETAM; BETHELBORO; CHARLEROI; EAST HAGERSTOWN; PAPER CITY; RIDGWAY; YUKON 2024-10-08 Not reported
Substations named ALLENPORT; CHARLEROI; IRON BRIDGE; MITCHELL; SMITHTON; YUKON → ALLENPORT; BELMON; CHARLEROI; IRON BRIDGE; MITCHELL; SMITHTON; YUKON 2026-01-16 2026-07-17
Substations named ALLENPORT; BELMON; CHARLEROI; IRON BRIDGE; MITCHELL; SMITHTON; YUKON → SMITHTON 2026-07-17 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 11
Stoner Junction 138 kV Line No role wording
138 kV
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 118
Misoperation Relay Projects “At Iron Bridge, replace circuit breaker, disconnect switches, substation conductor and relaying”
138 kV
2026-07-17 SRRTEP Western
Item 02 - APS Supplemental Projects p. 12
Smithton 138 kV Substation No role wording
138 kV
2026-01-16 SRRTEP Western
Item 03 - APS Supplemental Projects p. 3
Smithton 138 kV Substation No role wording
138 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 11
Stoner Junction 138 kV Line No role wording
138 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 118
Misoperation Relay Projects “At Iron Bridge, replace circuit breaker, disconnect switches, substation conductor and relaying”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this