Substation Scout

Renovo

Named in 4 PJM planning documents for 1 project, from February 12, 2026 to October 6, 2026.

Existingdescribed as
PPLzone
69kVkV as printed
4mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Lock Haven, PA
PPL-2026-0011
Conceptual $59.9 M 11/30/2030 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 6/30/2030 → 11/30/2030 2026-02-12 2026-06-16
Substations named FLEMINGTON; LOCK HAVEN; RENOVO → FLEMINGTON; FLEMINGTON TAP; LOCK HAVEN; RENOVO 2026-02-12 2026-06-16
Substations named FLEMINGTON; FLEMINGTON TAP; LOCK HAVEN; RENOVO → FLEMINGTON; LOCK HAVEN; RENOVO 2026-06-16 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 82
Lock Haven, PA No role wording
69kV
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 82
Lock Haven, PA No role wording
69kV
2026-06-16 SRRTEP Mid-Atlantic
Item 05 - PPL Supplemental Projects p. 4
Lock Haven, PA “Rebuild ~22.1 miles of Renovo Tap 69kV line as Double Circuit”
69kV
2026-02-12 SRRTEP Mid-Atlantic
Item 05 - PPL Supplemental Projects p. 5
Lock Haven, PA No role wording

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.