Junction Substation
Named in 11 PJM planning documents for 6 projects, from October 8, 2024 to October 6, 2026.
Existingdescribed as
APSzone
138 kVkV as printed
13mentions
Also printed as: Junction · Junction 138 kV substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| APS-2023-004 | Not printed | $ 42.6 M | 12/1/2027 | Not printed | 2024-10-08 TEAC |
| Misoperation Relay Projects APS-2023-067, APS-2023-068 · s3357.1, s3358.1 |
Not printed | Not printed | Not printed | Not printed | 2024-10-08 TEAC |
| Black Oak – Junction 138 kV Line APS-2024-056 · s3646.1, s3642.2, s3642.3 |
Not printed | $48.81 M | 12/14/2029 | Not printed | 2025-10-08 TEAC |
| Misoperation Relay Projects APS-2024-085, -86, -089, -090 |
Not printed | Not printed | Not printed | Not printed | 2024-10-18 SRRTEP Western |
| Misoperations Relays APS-2024-086 · s3934.1 |
Not printed | $4.67 M | 12/31/2028 | Not printed | 2026-10-06 TEAC |
| Junction – Parr Run 138 kV APS-2024-096 |
Conceptual | $35M | 06/16/2028 | Not printed | 2025-12-12 SRRTEP Western |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | BEVERLY TAP; DURBIN TAP; HARDY; JUNCTION; LOUGHS LANE; PICKENS → HARDY; JUNCTION; LOUGHS LANE; PICKENS | 2024-10-08 | Not reported |
| Substations named | JUNCTION; NORTH SHENANDOAH; OAK MOUND; PAGE; PARR RUN; QUIET DELL; TILTONSVILLE; WINDSOR → NORTH SHENANDOAH; PAGE | 2024-10-18 | 2026-04-15 |
| Substations named | JUNCTION; PARR RUN → JUNCTION; KELSO GAP; PARR RUN | 2024-11-15 | 2025-12-12 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 79 |
Misoperations Relays | “At Junction Substation: Replace disconnect switches, circuit breaker, CCVT, substation conductor, line trap, and relaying.” 138 kV |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 79 |
Misoperations Relays | “At Junction Substation: Replace disconnect switches” |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 83 |
APS-2023-004 | “Replace limiting substation conductor and disconnect switch at Junction 138 kV substation” 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 91 |
Misoperation Relay Projects | “At Junction Substation, replace circuit breaker, disconnect switches, substation conductor and relaying” 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 35 |
Black Oak – Junction 138 kV Line | “At Junction Substation, replace circuit breaker” 138 kV |
| 2026-07-17 | SRRTEP Western Item 02 - APS Supplemental Projects p. 9 |
Misoperations Relays | “At Junction Substation: Replace disconnect switches, circuit breaker, CCVT, substation conductor, line trap, and relaying.” |
| 2025-12-12 | SRRTEP Western Item 14 - APS Supplemental Projects p. 6 |
Junction – Parr Run 138 kV | No role wording 138 kV |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 35 |
Black Oak – Junction 138 kV Line | “At Junction Substation, replace circuit breaker, disconnect switches, line trap” 138 kV |
| 2025-03-14 | SRRTEP Western Item 07 - APS Supplemental Project p. 12 |
Black Oak – Junction 138 kV Line | “At Junction Substation, replace circuit breaker, disconnect switches, line trap, substation conductor and relaying” 138 kV |
| 2024-11-15 | SRRTEP Western Item 05 - APS Supplemental projects p. 11 |
Junction – Parr Run 138 kV | No role wording 138 kV |
| 2024-10-18 | SRRTEP Western Item 03 - APS Supplemental projects p. 4 |
Misoperation Relay Projects | No role wording 138 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 83 |
APS-2023-004 | “Replace limiting substation conductor and disconnect switch at Junction 138 kV substation” 138 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 91 |
Misoperation Relay Projects | “At Junction Substation, replace circuit breaker, disconnect switches, substation conductor and relaying” 138 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.