Named in 2 PJM planning documents for 2 projects, on October 8, 2024.

Existingdescribed as
DOMzone
115kVkV as printed
4mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Replace 115kV Ground Switches with Circuit Switchers -DEV
DOM-2022-0061 · s3052
Under construction $2.5 M 04/30/2024 Not printed 2024-10-08
TEAC
Princess Anne Substation – Upgrade TX#1
DOM-2023-0047 · s3221.1
Conceptual $0.5 M 12/30/2024 100 MW 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $1.86M → $2.5 M 2026-10-06 Not reported
Cost estimate
prior value printed on the same page
$ 2.5M → $1.86M 2026-01-15 2026-01-15
Cost estimate $2.5 M → $1.86M 2024-10-08 2026-01-15
Cost estimate
prior value printed on the same page
$2.5M → $1.86M 2026-10-06 2026-10-06
In-service date 12/31/2026 → 04/30/2024 2026-10-06 Not reported
In-service date 04/30/2024 → 12/31/2026 2024-10-08 2026-01-15
Status engineering (Engineering) → under-construction (Construction) 2026-10-06 Not reported
Status under-construction (Construction) → engineering (Engineering) 2024-10-08 2026-01-15
Substations named ALEXANDER CORNER; BROWN BOVERI; DEEP CREEK; QUANTICO; TUNIS → ALEXANDER CORNER; BROWN BOVERI; DEEP CREEK; PRINCESS ANNE; QUANTICO; TUNIS 2026-10-06 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Southern
Dominion p. 105
Replace 115kV Ground Switches with Circuit Switchers -DEV No role wording
2026-09-08* SRRTEP Southern
Dominion p. 157
Princess Anne Substation – Upgrade TX#1 “upgrade transformer 1 at Princess Anne Substation”
115kV
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 105
Replace 115kV Ground Switches with Circuit Switchers -DEV “substations that have legacy protection schemes”
115kV
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 157
Princess Anne Substation – Upgrade TX#1 “upgrade transformer 1 at Princess Anne Substation”
115kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this