Named in 3 PJM planning documents for 3 projects, from October 16, 2025 to November 13, 2025.

Existingdescribed as
PENELECzone
46 kVkV as printed
3mentions

PJM interconnection queue

A PJM queue substation page has the same name: Belleville (PA) — 2 queue requests filed, 0 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Belleville – Center Union 46 kV Line
b4012.1
Not printed $2.72 M 6/1/2030 Not printed 2025-11-13
SRRTEP Mid-Atlantic
Belleville – Center Union 46 kV Line Not printed $2.72 M 6/1/2030 Not printed 2025-10-16
SRRTEP Mid-Atlantic
Belleville (Warrior Ridge) 46 kV Line
PN-2022-003
Not printed $13.4M 12/31/2024 Not printed 2026-09-08*
SRRTEP Mid-Atlantic

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
Penelec local plan submission for 2024 RTEP p. 44
Belleville (Warrior Ridge) 46 kV Line “Replace switches at Belleville and Belleville New Holland”
2025-11-13 SRRTEP Mid-Atlantic
Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 19
Belleville – Center Union 46 kV Line No role wording
2025-10-16 SRRTEP Mid-Atlantic
Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 19
Belleville – Center Union 46 kV Line No role wording
46 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.