Substation Scout

Hayden

Named in 5 PJM planning documents for 4 projects, from November 6, 2024 to January 6, 2026.

Existingdescribed as
AEPzone
345 kV, 345kVkV as printed
5mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
West Cluster Recommended Selection (2nd Read)
b4068.1
Not printed $2,768.0M 10/1/2032 Not printed 2026-01-06
TEAC
Clusters AEP- 3, 4, 5 (Shortlist) Not printed Not printed Not printed Not printed 2024-11-06
TEAC
Jester - Hayden Not printed 229.411 Not printed Not printed 2024-11-19
TEAC
AEP Transmission Zone: Supplemental S3441.1 and .4 Scope Change
AEP-2021-OH049 & AEP-2023-OH041 · S3441.1 and .4
Engineering Not printed Jerome (1/30/2025, partially), Celtic (11/13/2025) 461 MW 2024-12-13
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date Jerome (1/30/2025, partially), Celtic (11/13/2025) → 12/01/2026 2024-12-13 Not reported
In-service date 12/01/2026 → Jerome (1/30/2025, partially), Celtic (11/13/2025) 2024-10-08 2024-12-13
Status engineering (Engineering) → conceptual (Scoping) 2024-12-13 Not reported
Status conceptual (Scoping) → engineering (Engineering) 2024-10-08 2024-12-13
Substations named AMLIN; CELTIC; HAYDEN; HYATT; JEROME; KILEVILLE → AMLIN; BEACON; BEATTY; BOLTON; CELTIC; COSGRAY; DUBLIN; HALL; HAYDEN; HYATT; JEROME; KILEVILLE; ROBERTS; SAWMILL; WILSON 2024-12-13 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
AEP local plan submission of the supplemental projects for 2024 RTEP p. 116
AEP Transmission Zone: Supplemental S3441.1 and .4 Scope Change No role wording
345 kV
2026-01-06 TEAC
Item 09 - Reliability Analysis Update p. 52
West Cluster Recommended Selection (2nd Read) “Rebuild 7.89 mile of Beatty - Hayden 345 kV line.”
345 kV
2024-12-13 SRRTEP Western
Item 17 - AEP Supplemental Projects p. 4
AEP Transmission Zone: Supplemental S3441.1 and .4 Scope Change No role wording
345 kV
2024-11-19 TEAC
Item 1 - Reliability Analysis Update p. 30
Jester - Hayden No role wording
345kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 55
Clusters AEP- 3, 4, 5 (Shortlist) “Hayden 345kV stations”
345kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.