Lick
Named in 10 PJM planning documents for 6 projects, from October 8, 2024 to October 6, 2026.
Existingdescribed as
AEPzone
138 kV, 138kV, 69kVkV as printed
10mentions
Also printed as: Lick station
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| AEP Transmission Zone: Baseline
Firebrick – Jefferson 69kV Reconductor b3875.1 |
Not printed | $8.5M | 4/1/2029 | Not printed | 2024-11-15 SRRTEP Western |
| AEP Transmission Zone: Baseline
B3959.1 Cancellation B3959.1 |
Cancelled | $1.099M | 06/01/2030 | Not printed | 2026-04-15 SRRTEP Western |
| AEP Transmission Zone: Baseline Firebrick – Jefferson 69kV Reconductor | Not printed | $8.5M | 4/1/2029 | Not printed | 2024-10-18 SRRTEP Western |
| Lick - Ironman 69kV Reconductor | Not printed | $1.099M | 06/01/2030 | Not printed | 2025-10-17 SRRTEP Western |
| Addison - Lick, Addison - Haners Upgrades AEP-2022-OH067, AEP-2022-OH069 · s3958.1-8 |
Conceptual | $165.726 M | 10/08/2032 | 20.6 MVA | 2026-10-06 TEAC |
| Jackson County, Ohio AEP-2023-OH057 · s3214.1-.4 |
Conceptual | $1.53 M | 12/31/2024 | 25 MW | 2024-10-08 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | ADDISON; CHICKAMAUGA; GAVIN; HANERS; LICK; RIO; SPORN → ADDISON; CHICKAMAUGA; GAVIN; HANERS; LICK; NORTH PROCTORVILLE; RIO; SPORN | 2026-10-06 | Not reported |
| Substations named | ADDISON; CHICKAMAUGA; GAVIN; HANERS; LICK; NORTH PROCTORVILLE; RIO; SPORN → ADDISON; CHICKAMAUGA; GAVIN; HANERS; LICK; RIO; SPORN | 2026-07-17 | 2026-10-06 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 77 |
Addison - Lick, Addison - Haners Upgrades | No role wording 138 kV |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 82 |
Addison - Lick, Addison - Haners Upgrades | No role wording 138kV |
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 75 |
Jackson County, Ohio | “Remove span of line from City of Jackson’s Lick station toward Veterans” 138 kV |
| 2026-07-17 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 26 |
Addison - Lick, Addison - Haners Upgrades | No role wording 138 kV |
| 2026-04-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 3 |
AEP Transmission Zone: Baseline B3959.1 Cancellation | “structure 44 to Lick station” |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 51 |
AEP Transmission Zone: Baseline B3959.1 Cancellation | “from structure 44 to
Lick station.” 69kV |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 45 |
Lick - Ironman 69kV Reconductor | “structure 44 to Lick station” 69kV |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 29 |
AEP Transmission Zone: Baseline Firebrick – Jefferson 69kV Reconductor | “Remote End (Line protection settings) would need to be updated at Firebrick and Lick.” |
| 2024-10-18 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 28 |
AEP Transmission Zone: Baseline Firebrick – Jefferson 69kV Reconductor | “updated at Firebrick and Lick.” |
| 2024-10-08 | TEAC Informational Only - AEP Local Plan submission of supplemental projects 2024 p. 75 |
Jackson County, Ohio | “Remove span of line from City of Jackson’s Lick station toward Veterans” 138 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.