Substation Scout

Beatty

Named in 10 PJM planning documents for 8 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
AEPzone
138 kV, 345 kV, 69kVkV as printed
13mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Beatty – Adkins 345kV Station Upgrades
b3877.1
Not printed $5M 4/1/2029 Not printed 2024-12-03
TEAC
AEP Transmission Zone: Baseline Beatty 69kV Cap Bank
b3880.1
Not printed $2.25M 6/1/2029 Not printed 2024-11-15
SRRTEP Western
West Cluster Recommended Selection (2nd Read)
b4068.1
Not printed $2,768.0M 10/1/2032 Not printed 2026-01-06
TEAC
Beatty – Adkins 345kV Station Upgrades Not printed $5M 4/1/2029 Not printed 2024-11-06
TEAC
AEP Transmission Zone: Baseline Beatty 69kV Cap Bank Not printed $2.25M 6/1/2029 Not printed 2024-10-18
SRRTEP Western
Dublin & Hilliard, OH
AEP-2021-OH049, AEP-2022-OH024, AEP-2022-OH035, AEP-2023-OH041 · s3441.1-.7
Conceptual $143.7M 12/01/2026 Not printed 2024-10-08
TEAC
AEP Transmission Zone: Supplemental s3440.3 Scope Change
AEP-2022-OH071 · s3440.3
Conceptual $77.4M 06/05/2027 675 MW 2026-10-06
TEAC
Beatty, OH/Cyprus, OH
AEP-2026-OH001 · s3907.1-3
Engineering $5.218 M 09/01/2026 675 MW 2026-10-07*
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date Jerome (1/30/2025, partially), Celtic (11/13/2025) → 12/01/2026 2024-12-13 Not reported
In-service date 12/01/2026 → Jerome (1/30/2025, partially), Celtic (11/13/2025) 2024-10-08 2024-12-13
Status engineering (Engineering) → conceptual (Scoping) 2024-12-13 Not reported
Status conceptual (Scoping) → engineering (Engineering) 2024-10-08 2024-12-13
Substations named AMLIN; CELTIC; HAYDEN; HYATT; JEROME; KILEVILLE → AMLIN; BEACON; BEATTY; BOLTON; CELTIC; COSGRAY; DUBLIN; HALL; HAYDEN; HYATT; JEROME; KILEVILLE; ROBERTS; SAWMILL; WILSON 2024-12-13 Not reported
Cost estimate
prior value printed on the same page
$57.5M → $77.4M Not reported Not reported
Cost estimate $57.5M → $77.4M Not reported Not reported
Cost estimate $77.4M → $57.5M 2026-10-06 Not reported
Cost estimate
prior value printed on the same page
$57.5M → $77.4M 2026-02-13 2026-02-13
Cost estimate $57.5M → $77.4M 2024-10-08 2026-02-13
Cost estimate
prior value printed on the same page
$57.5M → $77.4M 2026-10-06 2026-10-06
Substations named BEATTY; BIXBY; CANAL; CLINTON; CYPRUS; MARION; MOUND; OBETZ; PARSONS; ROZELLE; SAINT CLAIR AVENUE; WAVERLY → BEATTY; BIXBY; CYPRUS; MARION; PARSONS; SAINT CLAIR AVENUE; WAVERLY Not reported Not reported
Substations named BEATTY; BIXBY; CANAL; CYPRUS; MARION; PARSONS; WAVERLY → BEATTY; BIXBY; CANAL; CLINTON; CYPRUS; MARION; MOUND; OBETZ; PARSONS; ROZELLE; SAINT CLAIR AVENUE; WAVERLY 2026-10-06 Not reported
Substations named BEATTY; BIXBY; CANAL; CLINTON; CYPRUS; MARION; MOUND; OBETZ; PARSONS; ROZELLE; SAINT CLAIR AVENUE; WAVERLY → BEATTY; BIXBY; CLINTON; CYPRUS; MARION; MOUND; OBETZ; PARSONS; ROZELLE; SAINT CLAIR AVENUE; WAVERLY 2024-10-08 2026-02-13
Substations named BEATTY; BIXBY; CLINTON; CYPRUS; MARION; MOUND; OBETZ; PARSONS; ROZELLE; SAINT CLAIR AVENUE; WAVERLY → BEATTY; BIXBY; CANAL; CYPRUS; MARION; PARSONS; WAVERLY 2026-02-13 2026-10-06
In-service date Q2 2027 → 09/01/2026 2026-01-16 2026-03-19
Substations named CYPRUS → BEATTY; BIXBY; CYPRUS 2026-10-06 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-10-07* SRRTEP Western
AEP local plan submission of the supplemental projects for 2026 RTEP p. 51
AEP Transmission Zone: Supplemental s3440.3 Scope Change “Remote end relay upgrades are required at Beatty & Bixby 345 kV stations”
345 kV
2026-10-07* SRRTEP Western
AEP local plan submission of the supplemental projects for 2026 RTEP p. 57
Beatty, OH/Cyprus, OH No role wording
2026-10-06 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 51
AEP Transmission Zone: Supplemental s3440.3 Scope Change “Remote end relay upgrades are required at Beatty & Bixby 345 kV stations”
345 kV
2026-09-08* SRRTEP Western
AEP local plan submission of the supplemental projects for 2024 RTEP p. 108
AEP Transmission Zone: Supplemental s3440.3 Scope Change “Remote end relay upgrades are required at Beatty & Bixby 345 kV stations”
345 kV
2026-09-08* SRRTEP Western
AEP local plan submission of the supplemental projects for 2024 RTEP p. 124
Dublin & Hilliard, OH No role wording
138 kV
2026-02-13 SRRTEP Western
Item 02 - AEP Supplemental Projects p. 3
AEP Transmission Zone: Supplemental s3440.3 Scope Change “Remote end relay upgrades are required at Beatty & Bixby 345 kV stations.”
345 kV
2026-01-06 TEAC
Item 09 - Reliability Analysis Update p. 49
West Cluster Recommended Selection (2nd Read) “Create a new 345KV line position to interconnect the new 345KV Teddy line. Install two 345KV circuit breakers.”
345 kV
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 30
Beatty – Adkins 345kV Station Upgrades “Replace station conductor and switches in the 345 kV yard at Beatty”
345 kV
2024-11-15 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 34
AEP Transmission Zone: Baseline Beatty 69kV Cap Bank No role wording
69kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 22
Beatty – Adkins 345kV Station Upgrades “Replace station conductor and switches in the 345 kV yard at Beatty”
345 kV
2024-10-18 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 33
AEP Transmission Zone: Baseline Beatty 69kV Cap Bank No role wording
69kV
2024-10-08 TEAC
Informational Only - AEP Local Plan submission of supplemental projects 2024 p. 108
AEP Transmission Zone: Supplemental s3440.3 Scope Change “Remote end relay upgrades are required at Beatty & Bixby 345 kV stations”
345 kV
2024-10-08 TEAC
Informational Only - AEP Local Plan submission of supplemental projects 2024 p. 124
Dublin & Hilliard, OH No role wording
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.