Susquehanna

Named in 17 PJM planning documents for 12 projects, from November 6, 2024 to October 6, 2026.

Existingdescribed as
PPLzone
230 kV, 230KV, 230kV, 500-230kV, 500kVkV as printed
24mentions

PJM interconnection queue

A PJM queue substation page has the same name: Susquehanna (PA) — 13 queue requests filed, 4 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
PPL Transmission Zone: Baseline MAAC PPL Cluster
b4029.1
Not printed $565.4M 6/1/2030 Not printed 2025-12-08
TEAC
PPL Cluster
B4029.18
Not printed $7.39M Not printed Not printed 2026-05-08
TEAC
Harwood, PA
PPL-2024-0003
Conceptual $195.55 M 06/01/2027 1,980 MW 2026-10-06
TEAC
Harwood, PA
PPL-2024-0012 · s3549
Conceptual $73.3 M 05/30/2028 1,000 MW 2025-10-08
TEAC
Susquehanna, PA
PPL-2025-0003 · s3706
Not printed $19.4 M 05/30/2028 1,440 MW 2025-10-08
TEAC
Orefield, PA
PPL-2025-0006
Conceptual $194 M 05/31/2028 1000 MW 2026-10-06
TEAC
PPL Transmission Zone: Supplemental
PPL-2025-0010 · S3818
Conceptual $88.5M 5/30/2027 1000 MW 2026-05-08
TEAC
Beach Haven, PA
PPL-2026-0003
Conceptual $81.2 M 05/30/2028 1,500 MW 2026-05-08
TEAC
Nescopeck, PA
PPL-2026-0004
Conceptual $130.6 M 05/30/2029 1,350 MW 2026-05-08
TEAC
Natalie 500-230kV Substation
PPL-2026-0029
Conceptual $408 M 12/30/2029 2,000 MW 2026-09-08
TEAC
PPL Transmission Zone: Baseline
2024-W1-935
Not printed Not printed 6/1/2029 Not printed 2024-11-06
TEAC
MAAC PPL Cluster
2025-W1-558
Not printed $565.4M 6/1/2030 Not printed 2025-11-04
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $4.5 M → $7.39M 2026-01-06 2026-05-08
Cost estimate
prior value printed on the same page
$4.50M → $7.39M 2026-05-08 2026-05-08
Substations named KELAYRES; SUSQUEHANNA → SUSQUEHANNA 2026-01-06 2026-05-08
Cost estimate $196.55 M → $195.55 M Not reported Not reported
Cost estimate $195.55 M → $196.55 M 2026-10-06 Not reported
Cost estimate $197.55 M → $195.55 M 2025-05-06 2026-10-06
In-service date 6/1/2026: S3528.1, S3528.6, & S3528.11 6/1/2027: S3528.2, S3528.3, S3528.4, S3528.5, S3528.7, S3528.8, S3528.9, S3528.10 → 06/01/2027 Not reported Not reported
In-service date 06/01/2027 → 6/1/2026: S3528.1, S3528.6, & S3528.11 6/1/2027: S3528.2, S3528.3, S3528.4, S3528.5, S3528.7, S3528.8, S3528.9, S3528.10 2026-10-06 Not reported
Status unknown (Development) → conceptual (Conceptual) 2025-05-06 2026-10-06
Substations named GLEN BROOK; HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; SUSQUEHANNA T10; TOMHICKEN → HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; TOMHICKEN Not reported Not reported
Substations named HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; TOMHICKEN → GLEN BROOK; HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; SUSQUEHANNA T10; TOMHICKEN 2026-10-06 Not reported
Substations named GLEN BROOK; HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; SUSQUEHANNA T10; TOMHICKEN → HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; TOMHICKEN 2025-05-06 2026-10-06
In-service date 05/2027 → 05/30/2028 2024-10-08 2024-11-06
In-service date 04/2026 → 05/30/2028 2025-04-01 2025-05-06
Cost estimate $159 M → $194 M 2025-06-05 2025-11-04
In-service date 10/2026 → 05/30/2028 2025-05-06 2025-06-05
In-service date 05/30/2028 → 05/31/2028 2025-06-05 2025-11-04
Substations named ALBURTIS; ALLENTOWN; OREFIELD; SIEGFRIED; SUSQUEHANNA; WESCOSVILLE → ALLENTOWN; OREFIELD; SIEGFRIED; SUSQUEHANNA; WESCOSVILLE 2025-11-04 2026-10-06
Cost estimate $95 M → $88.5M 2025-09-09 2026-05-08
Cost estimate
prior value printed on the same page
$95M → $88.5M 2026-05-08 2026-05-08
In-service date 05/2027 → 05/30/2028 2025-05-06 2025-09-09
In-service date 05/30/2028 → 5/30/2027 2025-09-09 2026-05-08
In-service date 5/2028 → 05/30/2028 2026-03-10 2026-05-08
In-service date 10/2028 → 05/30/2029 2026-03-10 2026-05-08
In-service date 06/2028 → 12/30/2029 2026-04-07 2026-09-08

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 13
Harwood, PA “Expand yard, extend busses, and install two new bays at Susquehanna 230kV yard”
230kV
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 17
Orefield, PA No role wording
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 13
Harwood, PA “Expand yard, extend busses, and install two new bays at Susquehanna 230kV yard”
230kV
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 17
Orefield, PA No role wording
500kV
2026-09-08 TEAC
Item 07 - PPL Supplemental Projects p. 5
Natalie 500-230kV Substation No role wording
500kV
2026-09-08* SRRTEP Mid-Atlantic
PPL local plan submission for 2024 RTEP p. 31
Harwood, PA “Install a new line terminal at Susquehanna 230kV yard”
230kV
2026-09-08* SRRTEP Mid-Atlantic
PPL local plan submission for 2025 RTEP p. 33
Susquehanna, PA “Install one new 230kV breaker, 230kV dead-end, and ancillary equipment in Bay 0 at Susquehanna 230kV”
230kV
2026-09-08* SRRTEP Mid-Atlantic
PPL local plan submission for 2025 RTEP p. 7
Harwood, PA “Install 15 ohm series reactors on the Susquehanna - Harwood #1 and #2 230kV line at Susquehanna 230kV switchyard.”
230kV
2026-05-08 TEAC
Item 06 - PPL Supplemental Projects p. 12
Beach Haven, PA “Terminate the 230kV T22 lead line into the new Beach Haven 230kV switchyard”
500-230kV
2026-05-08 TEAC
Item 06 - PPL Supplemental Projects p. 14
Nescopeck, PA “Bifurcate Sunbury - Susquehanna 500kV line into the new Nescopeck 500kV yard”
500kV
2026-05-08 TEAC
Item 06 - PPL Supplemental Projects p. 4
PPL Transmission Zone: Supplemental “from Susquehanna 230kV switchyard to the Tomhicken 230kV switchyard”
230kV
2026-05-08 TEAC
Item 10 - Reliability Analysis Update p. 13
PPL Cluster “Replace the six 230KV breakers at Susquehanna”
230KV
2026-01-06 TEAC
Item 09 - Reliability Analysis Update p. 17
PPL Cluster “Replace the six 230KV breakers (2W T21, 4E PALO1, 5E MOUN, 2T T21 PALO, 4T GLBR PALO, CAP2) at Susquehanna”
230KV
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 28
PPL Transmission Zone: Baseline MAAC PPL Cluster No role wording
230 kV
2025-11-04 TEAC
Item 08 - PPL Supplemental Projects p. 4
Orefield, PA No role wording
500kV
2025-11-04 TEAC
Item 14 - Reliability Analysis Update p. 54
MAAC PPL Cluster No role wording
230 kV
2025-10-08 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 33
Susquehanna, PA “Install one new 230kV breaker, 230kV dead-end, and ancillary equipment in Bay 0 at Susquehanna 230kV”
230kV
2025-10-08 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 7
Harwood, PA “Install 15 ohm series reactors on the Susquehanna - Harwood #1 and #2 230kV line at Susquehanna 230kV switchyard”
230kV
2025-09-09 TEAC
Item 09 - PPL Supplemental Projects p. 8
PPL Transmission Zone: Supplemental “lines from Susquehanna 230kV switchyard”
230kV
2025-06-05 TEAC
Item 05 - PPL Supplemental Projects p. 6
Orefield, PA No role wording
500kV
2025-05-06 TEAC
Item 07 - PPL Supplemental Projects p. 12
Harwood, PA “Expand yard, extend busses and install two new bays at Susquehanna 230kV yard”
230kV
2025-05-06 TEAC
Item 07 - PPL Supplemental Projects p. 16
Susquehanna, PA “Install one new 230kV breaker, 230kV dead-end, and ancillary equipment in Bay 0 at Susquehanna 230kV”
230kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 50
PPL Transmission Zone: Baseline No role wording
230 kV
2024-11-06 TEAC
Item 08 - PPL Supplemental Projects p. 10
Harwood, PA “Install 15 ohm series reactors on the Susquehanna - Harwood #1 and #2 230kV line at Susquehanna 230kV switchyard”
230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.