Portage Substation

Named in 2 PJM planning documents for 1 project, on October 8, 2024.

Existingdescribed as
PENELECzone
46 kVkV as printed
2mentions

Also printed as: Portage

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Portage 46 kV Substation
PN-2023-010 · s3408.1
Not printed $3.7M 03/28/2025 Not printed 2024-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
Penelec local plan submission for 2024 RTEP p. 29
Portage 46 kV Substation “At Portage Substation, replace the 46 kV structure, including 46 kV line switches.”
46 kV
2024-10-08 TEAC
Informational Only - PENELEC Local Plan submission of supplemental project 2024 p. 28
Portage 46 kV Substation “At Portage Substation, replace the 46 kV structure”
46 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.