Substation Scout

Leisure Village

Named in 6 PJM planning documents for 4 projects, from October 8, 2025 to October 6, 2026.

Existingdescribed as
JCPLzone
230 kV, 230-34.5-12.47 kV, 34.5 kVkV as printed
6mentions

Also printed as: Leisure Village Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Metedconk and Vermont Ave 34.5 kV Substations
b4018.5
Not printed Not printed 6/1/2030 Not printed 2025-11-13
SRRTEP Mid-Atlantic
Metedconk and Vermont Ave 34.5 kV Substations Not printed $65.74 M 6/1/2030 Not printed 2025-10-16
SRRTEP Mid-Atlantic
Vermont Ave 34.5 kV Customer Connection
JCPL-2023-059 · s3284.1
Not printed $0.3M 03/31/2026 Not printed 2026-09-08*
SRRTEP Mid-Atlantic
Leisure Valley 230 kV Substation
JCPL-2024-001 · s4012.1
Not printed $50.23 M 06/01/2029 52 MW 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named VERMONT AVE → LARRABEE; LEISURE VILLAGE; SOUTH LAKEWOOD; VERMONT AVE 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - JCPL Local Plan Submission of Supplemental Projects for 2026 p. 48
Leisure Valley 230 kV Substation “At Leisure Village Substation: Rebuild the 230 kV station”
230-34.5-12.47 kV
2026-10-01* SRRTEP Mid-Atlantic
JCPL local plan submission for 2026 RTEP p. 48
Leisure Valley 230 kV Substation “At Leisure Village Substation: Rebuild the 230 kV station as a breaker and a half configuration”
230-34.5-12.47 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 57
Vermont Ave 34.5 kV Customer Connection No role wording
34.5 kV
2025-11-13 SRRTEP Mid-Atlantic
Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 33
Metedconk and Vermont Ave 34.5 kV Substations “Replace line relaying at Leisure Village Substation”
2025-10-16 SRRTEP Mid-Atlantic
Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 33
Metedconk and Vermont Ave 34.5 kV Substations “Replace line relaying at South Lakewood and Leisure Village Substations”
34.5 kV
2025-10-08 TEAC
Item 05 - JCPL Supplemental Projects p. 3
Leisure Valley 230 kV Substation “The existing Leisure Village Substation is a 230-34.5-12.47 kV substation”
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.