Quiet Dell Substation

Named in 5 PJM planning documents for 3 projects, from October 18, 2024 to October 6, 2026.

Existingdescribed as
APSzone
138 kVkV as printed
8mentions

Also printed as: Quiet Dell

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Misoperation Relay Projects
APS-2024-085, -86, -089, -090
Not printed Not printed Not printed Not printed 2024-10-18
SRRTEP Western
Misoperation Relays: Oak Mound - Quiet Dell 138 kV Line
APS-2024-089 · s3778.1
Not printed $2.63M 6/16/2028 Not printed 2026-10-06
TEAC
Oak Mound Control Building and Breakers
APS-2024-095 · s3777.1
Not printed $13.35M 6/16/2028 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named JUNCTION; NORTH SHENANDOAH; OAK MOUND; PAGE; PARR RUN; QUIET DELL; TILTONSVILLE; WINDSOR → NORTH SHENANDOAH; PAGE 2024-10-18 2026-04-15
Substations named GLEN FALLS; OAK MOUND; QUIET DELL; RIDER; WALDO RUN → GLEN FALLS; OAK MOUND; QUIET DELL 2025-09-19 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 20
Oak Mound Control Building and Breakers “At Quiet Dell Substation*: Install surge arresters.”
138 kV
2026-10-06 TEAC
Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 23
Misoperation Relays: Oak Mound - Quiet Dell 138 kV Line “At Quiet Dell Substation: Replace disconnect switches, wave trap, line turner and coax, CVT and relaying.”
138 kV
2026-09-28* SRRTEP Western
APS local plan submission of the supplemental projects for 2026 RTEP p. 20
Oak Mound Control Building and Breakers “At Quiet Dell Substation*: Install surge arresters.”
2026-09-28* SRRTEP Western
APS local plan submission of the supplemental projects for 2026 RTEP p. 23
Misoperation Relays: Oak Mound - Quiet Dell 138 kV Line “At Quiet Dell Substation: Replace disconnect switches”
2025-09-19 SRRTEP Western
Item 02 - APS Supplemental Projects p. 12
Misoperation Relays: Oak Mound - Quiet Dell 138 kV Line “At Quiet Dell Substation: Replace disconnect switches”
138 kV
2025-09-19 SRRTEP Western
Item 02 - APS Supplemental Projects p. 9
Oak Mound Control Building and Breakers “At Quiet Dell Substation*: Install surge arresters.”
138 kV
2024-11-15 SRRTEP Western
Item 05 - APS Supplemental projects p. 10
Oak Mound Control Building and Breakers No role wording
138 kV
2024-10-18 SRRTEP Western
Item 03 - APS Supplemental projects p. 4
Misoperation Relay Projects No role wording
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.