Eaglehead Substation
Named in 5 PJM planning documents for 2 projects, from March 4, 2025 to October 6, 2026.
Existingdescribed as
APSzone
230 kVkV as printed
5mentions
Also printed as: Eaglehead
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Eaglehead - Monocacy 230 kV Line APS-2025-003 · s3869.1 |
Not printed | $3.88M | 08/24/2029 | Not printed | 2026-10-06 TEAC |
| Misoperation Relays APS-2026-054 |
Not printed | Not printed | Not printed | Not printed | 2026-10-06 TEAC |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 37 |
Eaglehead - Monocacy 230 kV Line | “At Eaglehead Substation: Replace 230 kV circuit breaker, disconnect switches, substation conductor, CVT, CT, surge arresters, and relaying.” 230 kV |
| 2026-10-06 | TEAC Item 07 - APS Supplemental Projects - Presentation p. 3 |
Misoperation Relays | No role wording 230 kV |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 37 |
Eaglehead - Monocacy 230 kV Line | “At Eaglehead Substation: Replace 230 kV circuit breaker” 230 kV |
| 2025-11-04 | TEAC Item 04 - APS Supplemental Projects - Version 7 p. 6 |
Eaglehead - Monocacy 230 kV Line | “At Eaglehead Substation: Replace 230 kV circuit breaker” 230 kV |
| 2025-03-04 | TEAC Item 05 - APS Supplemental projects p. 3 |
Eaglehead - Monocacy 230 kV Line | No role wording 230 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.