Substation Scout

Dresden

Named in 6 PJM planning documents for 4 projects, from November 6, 2024 to February 3, 2026.

Existingdescribed as
COMEDzone
345 kV, 345kVkV as printed
6mentions

PJM interconnection queue

A PJM queue substation page has the same name: Dresden (IL) — 6 queue requests filed, 4 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Cluster 1
b3915.1
Not printed $16.27 M 6/1/2029 Not printed 2024-12-03
TEAC
Dresden 345kV BT4-8 CB
ComEd-2024-017 · s3725.1
Engineering $2.7M 12/31/2026 Not printed 2025-10-08
TEAC
Customer in Coal City
ComEd-2025-013
Conceptual $145M 7/1/2028 1,296 MW 2026-02-03
TEAC
Cluster 1
2024-W1-135
Not printed $16.27 M 6/1/2029 Not printed 2024-11-06
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
ComEd local plan submission of the supplemental projects for 2025 RTEP p. 26
Dresden 345kV BT4-8 CB “Dresden 345kV BT4-8 oil circuit breaker was installed in 1968”
345kV
2026-02-03 TEAC
Item 10 - ComEd Supplemental Projects p. 11
Customer in Coal City No role wording
345kV
2025-10-08 TEAC
Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 26
Dresden 345kV BT4-8 CB “Dresden 345kV BT4-8 oil circuit breaker was installed in 1968”
345kV
2025-03-04 TEAC
Item 11 - ComEd Supplemental Projects p. 3
Dresden 345kV BT4-8 CB “Dresden 345kV BT4-8 oil circuit breaker was installed in 1968.”
345kV
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 54
Cluster 1 “upgrade sisconnects and associated equipment at Dresden 345 kV”
345 kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 35
Cluster 1 “associated equipment at Dresden 345 kV”
345 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this