Dresden
Named in 6 PJM planning documents for 4 projects, from November 6, 2024 to February 3, 2026.
Existingdescribed as
COMEDzone
345 kV, 345kVkV as printed
6mentions
PJM interconnection queue
A PJM queue substation page has the same name: Dresden (IL) — 6 queue requests filed, 4 active.
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Cluster 1 b3915.1 |
Not printed | $16.27 M | 6/1/2029 | Not printed | 2024-12-03 TEAC |
| Dresden 345kV BT4-8 CB ComEd-2024-017 · s3725.1 |
Engineering | $2.7M | 12/31/2026 | Not printed | 2025-10-08 TEAC |
| Customer in Coal City ComEd-2025-013 |
Conceptual | $145M | 7/1/2028 | 1,296 MW | 2026-02-03 TEAC |
| Cluster 1 2024-W1-135 |
Not printed | $16.27 M | 6/1/2029 | Not printed | 2024-11-06 TEAC |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-09-08* | SRRTEP Western ComEd local plan submission of the supplemental projects for 2025 RTEP p. 26 |
Dresden 345kV BT4-8 CB | “Dresden 345kV BT4-8 oil circuit breaker was installed in 1968” 345kV |
| 2026-02-03 | TEAC Item 10 - ComEd Supplemental Projects p. 11 |
Customer in Coal City | No role wording 345kV |
| 2025-10-08 | TEAC Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 26 |
Dresden 345kV BT4-8 CB | “Dresden 345kV BT4-8 oil circuit breaker was installed in 1968” 345kV |
| 2025-03-04 | TEAC Item 11 - ComEd Supplemental Projects p. 3 |
Dresden 345kV BT4-8 CB | “Dresden 345kV BT4-8 oil circuit breaker was installed in 1968.” 345kV |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 54 |
Cluster 1 | “upgrade sisconnects and associated equipment at Dresden 345 kV” 345 kV |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 35 |
Cluster 1 | “associated equipment at Dresden 345 kV” 345 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.