Substation Scout

Point Pleasant

Named in 5 PJM planning documents for 3 projects, from October 8, 2024 to September 17, 2026.

Existingdescribed as
JCPLzone
34.5 kVkV as printed
6mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Automatic Restoration Projects
JCPL-2023-021 · s3243.1
Not printed $1.92 5/15/2025 Not printed 2024-10-08
TEAC
Larrabee - Point Pleasant B106 34.5 kV Line - Customer Connection
JCPL-2026-011
Conceptual $8.49 M 02/10/2031 11 MW 2026-09-17
SRRTEP Mid-Atlantic
Customer Connection - Larrabee-Point Pleasant No. 2 34.5 kV R44 Line, NJ
JCPL-2026-023
Conceptual $540,000 08/12/2027 0.66 MW 2026-09-17
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 12/13/2030 → 02/10/2031 2026-05-14 2026-09-17
In-service date 12/31/2027 → 08/12/2027 2026-06-16 2026-09-17

Every mention

DateDocumentProjectWhat the document says about it
2026-09-17 SRRTEP Mid-Atlantic
Item 01 - JCPL Supplemental Projects p. 31
Larrabee - Point Pleasant B106 34.5 kV Line - Customer Connection No role wording
34.5 kV
2026-09-17 SRRTEP Mid-Atlantic
Item 01 - JCPL Supplemental Projects p. 33
Customer Connection - Larrabee-Point Pleasant No. 2 34.5 kV R44 Line, NJ No role wording
34.5 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 14
Automatic Restoration Projects “At Point Pleasant, replace relaying”
34.5 kV
2026-06-16 SRRTEP Mid-Atlantic
Item 02 - JCPL Supplemental Projects p. 8
Customer Connection - Larrabee-Point Pleasant No. 2 34.5 kV R44 Line, NJ No role wording
34.5 kV
2026-05-14 SRRTEP Mid-Atlantic
Item 05 - JCPL Supplemental Projects p. 5
Larrabee - Point Pleasant B106 34.5 kV Line - Customer Connection No role wording
34.5 kV
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 14
Automatic Restoration Projects “At Point Pleasant, replace relaying”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this