Substation Scout

Frederick A Substation

Named in 4 PJM planning documents for 1 project, from February 4, 2025 to October 8, 2025.

Existingdescribed as
APSzone
230 kVkV as printed
4mentions

Also printed as: Frederick A

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
APS Transmission Zone M-3 Process Frederick, MD/Monocacy, MD
APS-2025-001 · S3656.1
Not printed $ 3.9 M 11/24/2027 Not printed 2025-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2025 RTEP p. 45
APS Transmission Zone M-3 Process Frederick, MD/Monocacy, MD “At Frederick A Substation: - Replace existing Line Relaying”
230 kV
2025-10-08 TEAC
Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 45
APS Transmission Zone M-3 Process Frederick, MD/Monocacy, MD “At Frederick A Substation: - Replace existing Line Relaying”
230 kV
2025-04-01 TEAC
Item 04 - APS Supplemental Projects p. 12
APS Transmission Zone M-3 Process Frederick, MD/Monocacy, MD “At Frederick A Substation: - Replace existing Line Relaying”
2025-02-04 TEAC
Item 05 - APS Supplemental Project p. 3
APS Transmission Zone M-3 Process Frederick, MD/Monocacy, MD “associated disconnect switches and protective relaying at Frederick A and Monocacy substations are aging with increasing maintenance concerns”
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this