Substation Scout

Spartan

Named in 4 PJM planning documents for 3 projects, from October 8, 2024 to October 6, 2026.

Newdescribed as
DOMzone
230kVkV as printed
4mentions

Described as new: “new substation (Spartan)” — source, page 131

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Spartan 230kV Delivery Point - DEV
DOM-2023-0018 · s3066
Engineering $48.0 M 05/02/2025 100 MW 2024-10-08
TEAC
Alto 230kV Delivery - DEV
DOM-2023-0056 · s3813
Engineering $16.5M 07/02/2027 213.7 MW 2026-10-06
TEAC
Centreport 230kV Delivery - DEV
DOM-2024-0005 · s3695.1
Conceptual $30.0 M 07/01/2027 136 MW 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named ALTO → ALLMAN; ALTO; AQUIA HARBOR; CENTREPORT; SPARTAN 2025-10-08 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 3
Alto 230kV Delivery - DEV No role wording
2026-09-08* SRRTEP Southern
Dominion p. 131
Spartan 230kV Delivery Point - DEV “new substation (Spartan)”
230kV
2025-10-08 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 5
Centreport 230kV Delivery - DEV No role wording
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 131
Spartan 230kV Delivery Point - DEV “new substation (Spartan)”
230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.