Substation Scout

Dumont

Named in 8 PJM planning documents for 3 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
AEPzone
345kV, 765 kVkV as printed
8mentions

Also printed as: Dumont station

PJM interconnection queue

A PJM queue substation page has the same name: Dumont (IN) — 7 queue requests filed, 3 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Central/NW OH, Indiana.
AEP-2022-OH023, AEP-2022-OH034, AEP-2022-OH036, AEP-2022-OH045, AEP-2022-OH046, AEP-2022-OH075, AEP-2022-OH077, AEP-2023-OH016, AEP-2023-OH019, AEP-2023-OH032, AEP-2023-OH040, AEP-2023-OH044, AEP-2023-OH052, AEP-2023-OH063 · s3442.1-.30
Conceptual $378.3M 10/13/2027 Not printed 2024-10-08
TEAC
AEP Transmission Zone M-3 Process Project Amazing Sites 100 and 201
AEP-2023-IM023 · s3588.1-.7
Conceptual $184.977M 12/15/2026 1100MW 2025-10-08
TEAC
New Carlisle, IN
AEP-2024-IM016 · s3763.1
Conceptual $50.364 M 03/15/2027 437MW 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$155.69 M → $184.977M 2024-10-08 2024-10-08
Substations named DUMONT; ELDERBERRY; KENZIE CREEK; LARRISON DRIVE; NEW PRAIRIE; OLIVE; SORENSON; THOMSON → DUMONT; ELDERBERRY; LARRISON DRIVE; NEW PRAIRIE; OLIVE; SORENSON 2025-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-10-07* SRRTEP Western
AEP local plan submission of the supplemental projects for 2026 RTEP p. 9
New Carlisle, IN No role wording
345kV
2026-10-06 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 9
New Carlisle, IN No role wording
2026-09-08* SRRTEP Western
AEP local plan submission of the supplemental projects for 2025 RTEP p. 12
AEP Transmission Zone M-3 Process Project Amazing Sites 100 and 201 “Remote end work at Dumont station”
2026-09-08* SRRTEP Western
AEP local plan submission of the supplemental projects for 2024 RTEP p. 155
Central/NW OH, Indiana. “Replace 3000 A circuit breaker at Dumont”
765 kV
2025-10-08 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 12
AEP Transmission Zone M-3 Process Project Amazing Sites 100 and 201 “Remote end work at Dumont station”
2025-04-01 TEAC
Item 05 - AEP Supplemental Projects p. 7
New Carlisle, IN No role wording
345kV
2024-10-08 TEAC
Item 06 - AEP Supplemental Projects p. 6
AEP Transmission Zone M-3 Process Project Amazing Sites 100 and 201 “Remote end work at Dumont station”
2024-10-08 TEAC
Informational Only - AEP Local Plan submission of supplemental projects 2024 p. 155
Central/NW OH, Indiana. “Replace 3000 A circuit breaker at Dumont”
765 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.