Belmont
Named in 8 PJM planning documents for 12 projects, from October 8, 2024 to October 16, 2026.
Existingdescribed as
APSzone
138 kV, 500 kV, 500/138 kVkV as printed
16mentions
Also printed as: Belmont 138 kV Substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Belmont 138 kV Breaker “B-8” Replacement b3983.2 |
Not printed | $0.957M | 6/1/2030 | Not printed | 2025-11-14 SRRTEP Western |
| Belmont 138 kV Breaker “B-8” Replacement | Not printed | $0.957M | 6/1/2030 | Not printed | 2025-10-17 SRRTEP Western |
| Misoperation Relay Project APS-2021-007 |
Not printed | Not printed | Not printed | Not printed | 2024-10-08 TEAC |
| Misoperation Relay Project APS-2021-008 |
Not printed | Not printed | Not printed | Not printed | 2024-10-08 TEAC |
| Misoperation Relay Projects APS-2024-002, APS-2024-003, APS-2024-004 · s3353.1, s3354.1, s3355.1 |
Not printed | Not printed | Not printed | Not printed | 2024-10-08 TEAC |
| Misoperation Relay Projects APS-2024-008, APS-2024-011, APS-2024-013, APS-2024-015, APS-2024-016, APS-2024-024, APS-2024-030 to APS-2024-034 · s3470.1, s3471.1, s3472.1, s3473.1, s3474.1, s3475.1, s3476.1, s3477.1, s3478.1, s3479.1, s3480.1 |
Not printed | Not printed | Not printed | Not printed | 2024-10-08 TEAC |
| Misoperation Relay Projects APS-2024-016, APS-2024-024, APS-2024-030, APS-2024-031 · s3474.1, s3475.1, s3476.1, s3477.1 |
Not printed | Not printed | Not printed | Not printed | 2026-09-08* SRRTEP Western |
| Belmont 500/138 kV Transformers APS-2024-020 to APS-2024-022 · s3461.1, s3462.1, s3463.1 |
Not printed | Not printed | Not printed | Not printed | 2024-10-08 TEAC |
| Misoperation Relay Projects APS-2024-032, APS-2024-033, APS-2024-034 · s3478.1, s3479.1, s3480.1 |
Not printed | Not printed | Not printed | Not printed | 2026-09-08* SRRTEP Western |
| Belmont – Long Reach 138 kV Line APS-2024-093 |
Conceptual | $76.11 M | 11/27/2030 | Not printed | 2026-10-16 SRRTEP Western |
| Belmont - Richwood Hill 138 kV Line APS-2026-010 |
Not printed | Not printed | Not printed | Not printed | 2026-08-14 SRRTEP Western |
| Belmont - Long Reach 138 kV Line APS-2026-017 |
Not printed | Not printed | Not printed | 3 MW | 2026-05-15 SRRTEP Western |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | BELMONT; FRENCH CREEK; JOHNS JCT; OAK GROVE; PARKERSBURG; PICKENS; TRISSLER → BELMONT; FRENCH CREEK; OAK GROVE; PARKERSBURG; PICKENS; TRISSLER | 2024-10-08 | Not reported |
| Substations named | BELMONT; LIME KILN; MONOCACY; PLEASANTS UNIT 1; PLEASANTS UNIT 2 → BELMONT; LIME KILN; MONOCACY | 2024-10-08 | Not reported |
| Substations named | ANTIETAM; BEDINGTON; BELMONT; BETHELBORO; CARNEGIE; CHARLEROI; DONEGAL; E HAGERSTOWN; EAST HAGERSTOWN; EDGELAWN; HAMPSHIRE; IRON BRIDGE; MARLOWE; PAPER CITY; RENO TAP; RIDGELEY; RIDGWAY; TIDD; TRISSLER; WEIRTON; YUKON → ANTIETAM; BETHELBORO; CHARLEROI; EAST HAGERSTOWN; PAPER CITY; RIDGWAY; YUKON | 2024-10-08 | Not reported |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-16 | SRRTEP Western Item 01 - APS Supplemental Projects Presentation p. 15 |
Belmont – Long Reach 138 kV Line | No role wording 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 110 |
Belmont 500/138 kV Transformers | “The 500/138 kV Transformers #1, 2 and 3 at Belmont were manufactured over 45 years ago and are approaching end of life.” 500/138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 118 |
Misoperation Relay Projects | “At Belmont, replace circuit breaker, disconnect switches, line trap and relaying” 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 119 |
Misoperation Relay Projects | “At Belmont, replace circuit breaker, disconnect switches, line trap and relaying” 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 79 |
Misoperation Relay Project | “Belmont 138 kV Substation – Replace substation conductor and wave trap” 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 88 |
Misoperation Relay Projects | “At Belmont, replace disconnect switches, substation conductor, surge arresters and relaying” 500 kV |
| 2026-08-14 | SRRTEP Western Item 01 - APS Supplemental Projects p. 4 |
Belmont - Richwood Hill 138 kV Line | No role wording 138 kV |
| 2026-05-15 | SRRTEP Western Item 03 - APS Supplemental Projects p. 3 |
Belmont - Long Reach 138 kV Line | No role wording 138 kV |
| 2025-11-14 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 83 |
Belmont 138 kV Breaker “B-8” Replacement | “1) Replace the overdutied Belmont 138 kV circuit
breaker “B-8" with a 63 kA circuit breaker. (b3983.2)” 138 kV |
| 2025-10-17 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 78 |
Belmont 138 kV Breaker “B-8” Replacement | “Belmont 138 kV Breaker “B-8” Replacement” 138 kV |
| 2024-11-15 | SRRTEP Western Item 05 - APS Supplemental projects p. 7 |
Belmont – Long Reach 138 kV Line | No role wording 138 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 111 |
Belmont 500/138 kV Transformers | “Replace 500/138 kV Transformer No. 1 with a new 500/138 kV transformer of the same size” 500/138 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 118 |
Misoperation Relay Projects | “At Belmont, replace circuit breaker, disconnect switches, line trap and relaying” |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 77 |
Misoperation Relay Project | No role wording 138 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 79 |
Misoperation Relay Project | “Belmont 138 kV Substation – Replace substation conductor and wave trap” 138 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 88 |
Misoperation Relay Projects | “At Belmont, replace disconnect switches, substation conductor, surge arresters and relaying” |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.