Substation Scout

Van Wert

Named in 4 PJM planning documents for 3 projects, from October 8, 2024 to November 15, 2024.

Existingdescribed as
AEPzone
69kVkV as printed
4mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP Transmission Zone: Baseline Van Wert 69kV D CB Replacement
b3884.1
Not printed $1.0M 6/1/2026 Not printed 2024-11-15
SRRTEP Western
AEP Transmission Zone: Baseline Van Wert 69kV D CB Replacement Not printed $1.0M 6/1/2026 Not printed 2024-10-18
SRRTEP Western
Haviland-Van Wert Rebuild
AEP-2022-OH043, AEP-2023-OH065 · s3142.1-.5
Conceptual $32.57M 1/1/2026 Not printed 2024-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
AEP local plan submission of the supplemental projects for 2024 RTEP p. 34
Haviland-Van Wert Rebuild “Perform remote end work at Van Wert”
2024-11-15 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 21
AEP Transmission Zone: Baseline Van Wert 69kV D CB Replacement “Replace the over duty Van Wert 69kV circuit breaker D”
69kV
2024-10-18 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 19
AEP Transmission Zone: Baseline Van Wert 69kV D CB Replacement “Replace the over duty Van Wert 69kV circuit breaker D”
69kV
2024-10-08 TEAC
Informational Only - AEP Local Plan submission of supplemental projects 2024 p. 34
Haviland-Van Wert Rebuild “Perform remote end work at Van Wert”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this