Medina
Named in 7 PJM planning documents for 4 projects, from October 8, 2024 to October 6, 2026.
Existingdescribed as
ATSIzone
69 kVkV as printed
9mentions
Also printed as: Medina Substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Abbe – Medina 69 kV Line Customer Connection - s2056 Scope Change ATSI-2019-056 (s2056) · s2056 |
Not printed | $0.9 M | 12/31/2024 | Not printed | 2025-10-08 TEAC |
| Medina/Seville Area ATSI-2021-021 · s3947.1 |
Not printed | Not printed | Not printed | 59 MW | 2026-10-06 TEAC |
| ATSI Transmission Zone M-3 Process
Abbe – Medina 69 kV Line Customer Connection ATSI-2024-005 · s3363.1 |
Not printed | $0.0M | 6/1/2024 | 3.1 MVA | 2024-10-08 TEAC |
| ATSI Transmission Zone M-3 Process
Abbe – Medina 69 kV Line Customer Connection ATSI-2024-036 · s3500.1 |
Not printed | $0.2M | 8/29/2025 | 5 MVA | 2024-10-08 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | ABBE; MEDINA; NORTH MEDINA; RYAN; SEVILLE; STAR; WEST AKRON; WEST MEDINA → MEDINA; RYAN; SEVILLE; WEST MEDINA | 2026-07-17 | 2026-10-06 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2026 p. 57 |
Medina/Seville Area | “An n-1 at Medina Substation results in the loss of approximately 59 MW” |
| 2026-09-23* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2026 RTEP p. 57 |
Medina/Seville Area | No role wording |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 59 |
ATSI Transmission Zone M-3 Process Abbe – Medina 69 kV Line Customer Connection | No role wording 69 kV |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 92 |
ATSI Transmission Zone M-3 Process Abbe – Medina 69 kV Line Customer Connection | “Adjust relay settings at Abbe and Medina substations” 69 kV |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 4 |
Abbe – Medina 69 kV Line Customer Connection - s2056 Scope Change | “Adjust relay settings at Abbe and Medina substations.” 69 kV |
| 2026-07-17 | SRRTEP Western Item 03 - ATSI Supplemental Projects p. 12 |
Medina/Seville Area | “Convert Medina Substation 69 kV yard into a breaker and half configuration” 69 kV |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 4 |
Abbe – Medina 69 kV Line Customer Connection - s2056 Scope Change | “Tap the Abbe-Medina 69 kV line approximately 11.1 miles from Medina substation” 69 kV |
| 2024-10-08 | TEAC Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 59 |
ATSI Transmission Zone M-3 Process Abbe – Medina 69 kV Line Customer Connection | No role wording 69 kV |
| 2024-10-08 | TEAC Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 92 |
ATSI Transmission Zone M-3 Process Abbe – Medina 69 kV Line Customer Connection | “Adjust relay settings at Abbe and Medina substations” 69 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.