Substation Scout

Lockridge

Named in 4 PJM planning documents for 5 projects, from October 8, 2024 to December 8, 2025.

Existingdescribed as
DOMzone
230kVkV as printed
10mentions

Also printed as: Lockridge Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dominion Transmission Zone: Baseline New Mars – Lockridge – Golden 230kV Lines New Mars – Golden 500kV Line
b3800.210
Not printed $431.62M 6/1/2027 Not printed 2025-12-08
TEAC
Barrister 230kV Delivery - DEV
DOM-2022-0001 · s3027
Engineering $24.0M 06/30/2026 147.0 MW 2024-10-08
TEAC
Prentice Drive 230kV Delivery - DEV
DOM-2022-0003 · s3056
Engineering $20.0 M 12/30/2024 100MW 2024-10-08
TEAC
Stratus 230kV Delivery - DEV
DOM-2022-0041 · s3033
Engineering $24.0M 08/29/2025 185.0 MW 2024-10-08
TEAC
Lockridge – Add 3 TX’s - DEV
DOM-2022-0044 · s3034
Under construction $1.5M 02/28/2024 288.0 MW 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$342.92M → $439.92M 2025-04-01 2025-04-01
Cost estimate
prior value printed on the same page
$342.92M → $431.62M 2025-12-08 2025-12-08
Cost estimate $439.92M → $431.62M 2025-04-01 2025-12-08
Substations named LOCKRIDGE; PRENTICE; PRENTICE DRIVE; SHELLHORN → LOCKRIDGE; PRENTICE DRIVE; SHELLHORN 2024-10-08 Not reported
Substations named ENTERPRISE; LOCKRIDGE; ROUNDTABLE; SHELLHORN; STRATUS → BARRISTER; ENTERPRISE; LOCKRIDGE; ROUNDTABLE; SHELLHORN; STRATUS 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Southern
Dominion p. 19
Barrister 230kV Delivery - DEV No role wording
2026-09-08* SRRTEP Southern
Dominion p. 55
Stratus 230kV Delivery - DEV No role wording
2026-09-08* SRRTEP Southern
Dominion p. 56
Lockridge – Add 3 TX’s - DEV “add a three additional distribution transformers at Lockridge Substation”
2026-09-08* SRRTEP Southern
Dominion p. 69
Prentice Drive 230kV Delivery - DEV No role wording
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 134
Dominion Transmission Zone: Baseline New Mars – Lockridge – Golden 230kV Lines New Mars – Golden 500kV Line “Remove the two 230kV 80kA circuit breakers and associated terminal equipment from Lockridge substation”
230kV
2025-04-01 TEAC
Item 14 - Reliability Analysis Update p. 5
Dominion Transmission Zone: Baseline New Mars – Lockridge – Golden 230kV Lines New Mars – Golden 500kV Line “Install 230kV equipment at Mars and Lockridge substations”
230kV
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 19
Barrister 230kV Delivery - DEV No role wording
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 55
Stratus 230kV Delivery - DEV No role wording
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 56
Lockridge – Add 3 TX’s - DEV “add a three additional distribution transformers at Lockridge Substation”
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 69
Prentice Drive 230kV Delivery - DEV No role wording

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.