Angola

Named in 4 PJM planning documents for 2 projects, from October 8, 2024 to October 8, 2025.

Existingdescribed as
ATSIzone
138 kVkV as printed
4mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Angola – Midway 138 kV Line
ATSI-2022-013 · s3543.1
Not printed $11.6M 3/14/2028 38.5 MW 2025-10-08
TEAC
ATSI Transmission Zone M-3 Process Misoperation Relays Projects
ATSI-2024-008 · s3468.1
Not printed $3.42 M 04/01/2029 Not printed 2024-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2024 RTEP p. 78
ATSI Transmission Zone M-3 Process Misoperation Relays Projects “Angola  Replace circuit switcher with a new circuit breaker”
2026-09-08* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2025 RTEP p. 5
Angola – Midway 138 kV Line No role wording
138 kV
2025-10-08 TEAC
Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 5
Angola – Midway 138 kV Line No role wording
138 kV
2024-10-08 TEAC
Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 78
ATSI Transmission Zone M-3 Process Misoperation Relays Projects “Replace circuit switcher with a new circuit breaker, replace line trap, limiting substation conductor and line relaying.”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.