Substation Scout

Midway

Named in 4 PJM planning documents for 4 projects, from October 8, 2024 to October 8, 2025.

Existingdescribed as
ATSIzone
138 kVkV as printed
8mentions

Also printed as: Midway Substation

PJM interconnection queue

A PJM queue substation page has the same name: Midway (OH) — 4 queue requests filed, 0 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AMPT Projects in ATSI Transmission Zone M3 Process Napoleon, OH
AMPT-2023-005 · s3352.2
Not printed $7.1 M 10/2/2026 43 MW 2024-10-08
TEAC
ATSI Transmission Zone M-3 Process Midway – Richland – Wauseon 138 kV Line
ATSI-2020-028 · s3370.1
Not printed $44 M 12/31/2026 Not printed 2024-10-08
TEAC
Angola – Midway 138 kV Line
ATSI-2022-013 · s3543.1
Not printed $11.6M 3/14/2028 38.5 MW 2025-10-08
TEAC
ATSI Transmission Zone M-3 Process Misoperation Relays Projects
ATSI-2024-008 · s3468.1
Not printed $3.42 M 04/01/2029 Not printed 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $18.6 M → $7.1 M Not reported Not reported
Cost estimate $7.1 M → $18.6 M 2024-10-08 Not reported
Cost estimate $18.6 M → $7.1 M 2024-10-08 2024-10-08
In-service date 8/1/2026 (AMPT), 10/02/2026 (FE) → 10/2/2026 Not reported Not reported
In-service date 10/2/2026 → 8/1/2026 (AMPT), 10/02/2026 (FE) 2024-10-08 Not reported
In-service date 8/1/2026 (AMPT), 10/02/2026 (FE) → 10/2/2026 2024-10-08 2024-10-08
Substations named MIDWAY; NAPOLEON; RICHLAND; SULLIVAN → ENTERPRISE; MIDWAY; NAPOLEON; RICHLAND; SULLIVAN 2024-10-08 Not reported
Substations named ENTERPRISE; FE NAPOLEON; MIDWAY; RICHLAND; SULLIVAN → MIDWAY; NAPOLEON; RICHLAND; SULLIVAN 2024-10-08 2024-10-08

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2024 RTEP p. 107
AMPT Projects in ATSI Transmission Zone M3 Process Napoleon, OH “Revise relay settings at Napoleon, Richland, and Midway substations”
2026-09-08* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2024 RTEP p. 41
ATSI Transmission Zone M-3 Process Midway – Richland – Wauseon 138 kV Line “Upgrade substation conductor at Midway Substation and Wauseon Substation.”
2026-09-08* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2024 RTEP p. 78
ATSI Transmission Zone M-3 Process Misoperation Relays Projects “Midway  Replace circuit breaker and associated disconnect switches”
2026-09-08* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2025 RTEP p. 5
Angola – Midway 138 kV Line No role wording
138 kV
2025-10-08 TEAC
Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 5
Angola – Midway 138 kV Line No role wording
138 kV
2024-10-08 TEAC
Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 106
AMPT Projects in ATSI Transmission Zone M3 Process Napoleon, OH “Revise relay settings at Napoleon, Richland, and Midway substations”
2024-10-08 TEAC
Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 41
ATSI Transmission Zone M-3 Process Midway – Richland – Wauseon 138 kV Line “Upgrade substation conductor at Midway Substation and Wauseon Substation.”
138 kV
2024-10-08 TEAC
Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 78
ATSI Transmission Zone M-3 Process Misoperation Relays Projects “Replace circuit breaker and associated disconnect switches, replace line trap and line relaying.”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this