Rockaway Substation

Named in 4 PJM planning documents for 1 project, from December 12, 2025 to October 6, 2026.

Existingdescribed as
ATSIzone
69 kVkV as printed
4mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Rockaway Substation 69 kV
ATSI-2025-038 · s3941.1
Not printed $3.43M 06/22/2028 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named OS KELLY; ROCKAWAY; SPRINGFIELD MEDICAL → ROCKAWAY 2026-04-15 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2026 p. 45
Rockaway Substation 69 kV “Replace breakers B-20, B-21 and B-22 and associated disconnect switches at Rockaway Substation.”
69 kV
2026-09-23* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2026 RTEP p. 46
Rockaway Substation 69 kV “Replace breakers B-20, B-21 and B-22 and associated disconnect switches at Rockaway Substation.”
69 kV
2026-04-15 SRRTEP Western
Item 03 - ATSI Supplemental Project p. 15
Rockaway Substation 69 kV “Replace breakers B-20, B-21 and B-22 and associated disconnect switches at Rockaway Substation.”
69 kV
2025-12-12 SRRTEP Western
Item 13 - ATSI Supplemental Projects p. 4
Rockaway Substation 69 kV “The existing Rockaway Substation 69 kV oil circuit breakers”
69 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.