Middlesex

Named in 4 PJM planning documents for 3 projects, from October 8, 2024 to May 8, 2026.

Existingdescribed as
JCPLzone
230 kVkV as printed
4mentions

Also printed as: Middlesex 230 kV Switching Station · Middlesex substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
JCPL Transmission Zone: NJ SAA Baseline Project Cancelations
b3737.27
Not printed Not printed 6/1/2029 Not printed 2026-05-08
TEAC
Middlesex 230 kV Switching Station
s3261.1
Not printed $8.85M FirstEnergy, $9.04M PSE&G 12/31/2027 Not printed 2025-01-07
TEAC
Middlesex 230 kV Switching Station
JCPL-2023-062 · s3261.1
Not printed $8.85M 6/1/2026 Not printed 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named MIDDLESEX → BRIDGEWATER; GILLETTE; LAKE NELSON; MIDDLESEX 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 37
Middlesex 230 kV Switching Station “Convert the existing Middlesex 230 kV Switching Station to a three (3) breaker ring bus”
230 kV
2026-05-08 TEAC
Item 10 - Reliability Analysis Update p. 28
JCPL Transmission Zone: NJ SAA Baseline Project Cancelations “Middlesex substation 230 kV – Replace the 2000A circuit switcher”
230 kV
2025-01-07 TEAC
Item 06 - JCPL Supplemental Projects p. 4
Middlesex 230 kV Switching Station “Convert the existing Middlesex 230 kV Switching Station to a three (3) breaker ring bus”
230 kV
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 37
Middlesex 230 kV Switching Station “Convert the existing Middlesex 230 kV Switching Station to a three (3) breaker ring bus.”
230 kV