Acahela

Named in 6 PJM planning documents for 5 projects, from November 6, 2024 to October 6, 2026.

Existingdescribed as
PPLzone
230kV, 500/230/69 kV, 69kVkV as printed
7mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Pocono area Evaluation Progress Not printed $4.93 10/30/2027 Not printed 2024-11-06
TEAC
Big Bass, PA
PPL-2025-0012
Conceptual $186.875 M 05/30/2028 1,500 MW 2026-10-06
TEAC
PPL Transmission Zone: Supplemental Lake Naomi, PA
PPL-2026-0013
Not printed $28.8 M 12/30/2028 290MW 2026-06-16
SRRTEP Mid-Atlantic
Arrowhead Tap
PPL-2026-0039
Conceptual $7.6 M 11/30/2030 Not printed 2026-09-17
SRRTEP Mid-Atlantic
Jack Frost Tap
PPL-2026-0043
Conceptual $2.8 M 11/30/2029 Not printed 2026-09-17
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 05/2027 → 05/30/2028 2025-07-08 2025-09-09
In-service date 11/30/2029 → 11/30/2030 2026-07-17 2026-09-17
Substations named ARROWHEAD → ACAHELA; ARROWHEAD; JACKSON 2026-07-17 2026-09-17
Substations named JACK FROST → ACAHELA; EAST PALMERTON; JACK FROST 2026-08-13 2026-09-17

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 27
Big Bass, PA “Install a new DBDB (BAAH ultimate) bay at Acahela 230kV yard”
230kV
2026-09-17 SRRTEP Mid-Atlantic
Item 04 - PPL Supplemental Projects p. 11
Arrowhead Tap No role wording
69kV
2026-09-17 SRRTEP Mid-Atlantic
Item 04 - PPL Supplemental Projects p. 15
Jack Frost Tap No role wording
69kV
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 27
Big Bass, PA “Install a new DBDB (BAAH ultimate) bay at Acahela 230kV yard”
230kV
2026-06-16 SRRTEP Mid-Atlantic
Item 05 - PPL Supplemental Projects p. 6
PPL Transmission Zone: Supplemental Lake Naomi, PA No role wording
69kV
2025-09-09 TEAC
Item 09 - PPL Supplemental Projects p. 10
Big Bass, PA “Install a new DBDB (BAAH ultimate) bay at Acahela 230kV yard”
230kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 49
Pocono area Evaluation Progress “Acahela 500/230/69 kV Substation Expansion”
500/230/69 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.