Substation Scout

White Oak

Named in 6 PJM planning documents for 6 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
DOMzone
230kVkV as printed
12mentions

Also printed as: White Oak Substation · White Oak substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
White Oak 230kV Delivery - DEV
DOM-2022-0038
Engineering $30 M March 2023 146.5 MW 2024-10-08
TEAC
Techpark Place 230kV Delivery - DEV
DOM-2022-0039 · s3031
Under construction $25 M 04/01/2024 283.6 MW 2024-10-08
TEAC
Lost City 230kV Delivery - DEV
DOM-2023-0033 · s3502.1
Engineering $12.3 M 07/01/2025 100 MW 2024-10-08
TEAC
Decoy Airfield 230kV Delivery - DEV
DOM-2024-0001 · s3508.1
Engineering $12.0 M 01/01/2026 100 MW 2024-10-08
TEAC
Dominion Transmission Zone: Supplemental Do No Harm Analysis
DOM-2024-0018 · s3673
Engineering $20M Substation, $5M Transmission Line Q4 2027 255.0 MW 2025-10-08
TEAC
Stockholm 230kV Delivery - DEV
DOM-2024-0049 · s3995
Conceptual $ 26M Q4 2028 300 MW 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named DARBYTOWN; PORTUGEE; TECHPARK PLACE; TPP; WHITE OAK → DARBYTOWN; PORTUGEE; TECHPARK PLACE TPP; TPP; WHITE OAK 2024-10-08 Not reported
Substations named DECOY; DECOY AIRFIELD; TECHPARK PLACE; WHITE OAK → DECOY AIRFIELD; TECHPARK PLACE; WHITE OAK 2024-10-08 Not reported
In-service date Q4 2027 → 12/01/2030 2025-01-07 2025-05-06
In-service date 12/01/2030 → Q4 2027 2025-05-06 2025-10-08
Status engineering (Engineering) → conceptual (Conceptual) 2025-01-07 2025-05-06
Status conceptual (Conceptual) → engineering (Engineering) 2025-05-06 2025-10-08
Substations named CHICKAHOMINY; ELMONT; THICKET; WHITE OAK → BERMUDA HUNDRED; CHICKAHOMINY; DARBYTOWN; ELKO; ELMONT; TECHPARK PLACE; THICKET; WHITE OAK 2025-01-07 2025-05-06
Substations named STOCKHOLM; THICKET → CHICKAHOMINY; ELMONT; STOCKHOLM; THICKET; WHITE OAK 2026-05-08 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 60
Stockholm 230kV Delivery - DEV No role wording
2026-09-08* SRRTEP Southern
Dominion p. 166
Lost City 230kV Delivery - DEV “230kV Line 2282 (Techpark Place to White Oak)”
2026-09-08* SRRTEP Southern
Dominion p. 172
Decoy Airfield 230kV Delivery - DEV “230kV Line 2280 (Techpark Place to White Oak)”
2026-09-08* SRRTEP Southern
Dominion p. 48
White Oak 230kV Delivery - DEV “delivery point request at White Oak Substation”
230kV
2026-09-08* SRRTEP Southern
Dominion p. 51
Techpark Place 230kV Delivery - DEV No role wording
2025-10-08 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 25
Dominion Transmission Zone: Supplemental Do No Harm Analysis “out of White Oak”
2025-05-06 TEAC
Item 09 - DOM Supplemental Projects p. 8
Dominion Transmission Zone: Supplemental Do No Harm Analysis “in and out of White Oak substation”
2025-01-07 TEAC
Item 10 - Dominion Supplemental Projects p. 4
Dominion Transmission Zone: Supplemental Do No Harm Analysis “Loop existing Line 2075 (Elmont – Chickahominy) in and out of White Oak”
230kV
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 166
Lost City 230kV Delivery - DEV No role wording
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 172
Decoy Airfield 230kV Delivery - DEV No role wording
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 48
White Oak 230kV Delivery - DEV “upgrade bus work and existing equipment at the White Oak Substation”
230kV
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 51
Techpark Place 230kV Delivery - DEV No role wording

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this