Substation Scout

Deep Creek

Named in 4 PJM planning documents for 1 project, from October 8, 2024 to October 6, 2026.

Existingdescribed as
DOMzone
115kVkV as printed
4mentions

PJM interconnection queue

A PJM queue substation page has the same name: Deep Creek (VA) — 2 queue requests filed, 0 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Operational Flexibility and Efficiency
DOM-2022-0061 · s3052
Engineering $1.86M 12/31/2026 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $1.86M → $2.5 M 2026-10-06 Not reported
Cost estimate
prior value printed on the same page
$ 2.5M → $1.86M 2026-01-15 2026-01-15
Cost estimate $2.5 M → $1.86M 2024-10-08 2026-01-15
Cost estimate
prior value printed on the same page
$2.5M → $1.86M 2026-10-06 2026-10-06
In-service date 12/31/2026 → 04/30/2024 2026-10-06 Not reported
In-service date 04/30/2024 → 12/31/2026 2024-10-08 2026-01-15
Status engineering (Engineering) → under-construction (Construction) 2026-10-06 Not reported
Status under-construction (Construction) → engineering (Engineering) 2024-10-08 2026-01-15
Substations named ALEXANDER CORNER; BROWN BOVERI; DEEP CREEK; QUANTICO; TUNIS → ALEXANDER CORNER; BROWN BOVERI; DEEP CREEK; PRINCESS ANNE; QUANTICO; TUNIS 2026-10-06 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2026 p. 44
Operational Flexibility and Efficiency “Remove the ground switches and install circuit switchers at 5 4 substations: Quantico Tx# 1 & 2 Deep Creek Tx# 1 & 2”
2026-09-08* SRRTEP Southern
Dominion p. 106
Operational Flexibility and Efficiency “install circuit switchers at 5 substations –  Quantico Tx# 1 & 2  Deep Creek Tx# 1 & 2”
115kV
2026-01-15 SRRTEP Southern
Item 05 - DOM Supplemental Projects p. 5
Operational Flexibility and Efficiency “install circuit switchers at 5 4 substations: Quantico Tx# 1 & 2 q Deep Creek Tx# 1 & 2”
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 105
Operational Flexibility and Efficiency “install circuit switchers at 5 substations – q Deep Creek”
115kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this