Substation Scout

Demeter

Named in 2 PJM planning documents for 1 project, from October 8, 2025 to September 8, 2026.

Newdescribed as
DOMzone
230 kVkV as printed
2mentions

Described as new: “new substation (Demeter)” — source, page 15

Also printed as: Demeter Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Demeter 230kV Delivery - NOVEC
DOM-2024-0062
Cancelled $15.5M 05/01/2028 100 MW 2026-09-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Status engineering (Engineering) → cancelled (Canceled) 2025-10-08 2026-09-08
Substations named DEMETER → DEMETER; LOUDOUN; OLD LIMB 2025-10-08 2026-09-08

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08 TEAC
Item 10 - DOM Supplemental Projects p. 15
Demeter 230kV Delivery - NOVEC “new substation (Demeter)”
230 kV
2025-10-08 TEAC
Item 12 - DOM Supplemental Projects p. 45
Demeter 230kV Delivery - NOVEC “interconnect the proposed Demeter Substation”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this