Named in 4 PJM planning documents for 1 project, from June 13, 2025 to October 6, 2026.

Existingdescribed as
AMPTzone
69 kVkV as printed
4mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AMPT Projects in ATSI Transmission Zone M3 Process Bowling Green, OH
AMPT-2025-003 · s3767.1 (AMPT)
Engineering $3.2M 10/30/2027 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named GYPSY LANE; SUB 3 GYPSY LANE → GYPSY LANE; GYPSY LANE SUB3; SUB 3 GYPSY LANE 2025-06-13 2025-08-15
Substations named GYPSY LANE; GYPSY LANE SUB3; SUB 3 GYPSY LANE → GYPSY LANE 2025-08-15 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - AMPT Local Plan Submission of the Supplemental Projects for 2026 p. 6
AMPT Projects in ATSI Transmission Zone M3 Process Bowling Green, OH “Add one (1) new 69 kV bus tie-breaker and two (2) new 69 kV circuit switchers on the high-side of the distribution transformers”
69 kV
2026-09-08* SRRTEP Western
AMPT local plan submission of the supplemental projects for 2026 RTEP p. 6
AMPT Projects in ATSI Transmission Zone M3 Process Bowling Green, OH “Gypsy Lane (Sub3) Station: Add one (1) new 69 kV bus tie-breaker”
69 kV
2025-08-15 SRRTEP Western
Item 01 - AMPT Supplemental Projects p. 5
AMPT Projects in ATSI Transmission Zone M3 Process Bowling Green, OH “The Gypsy Lane transformers have high-side switches that require significant prep work in order to get them to open properly and are in need of replacement.”
2025-06-13 SRRTEP Western
Item 04 - AMPT Supplemental Projects p. 3
AMPT Projects in ATSI Transmission Zone M3 Process Bowling Green, OH “Gypsy Lane's existing configuration allows for single contingencies to drop the entire station load”