Montgomery
Named in 6 PJM planning documents for 3 projects, from October 8, 2024 to October 6, 2026.
Existingdescribed as
APSzone
230 kVkV as printed
6mentions
Also printed as: Montgomery substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Damascus – Montgomery 230 kV Line Misoperation Relay Project APS-2024-001 · s3451.1 |
Not printed | $2.8M | 06/01/2027 | Not printed | 2024-10-08 TEAC |
| Misoperation Relay Projects APS-2024-058 · s3541.1 |
Not printed | $9.20 | 10/31/2026 | Not printed | 2025-10-08 TEAC |
| Lime Kiln – Montgomery 230 kV Line APS-2024-091 |
Conceptual | $73.5 M | 12/13/2030 | Not printed | 2026-10-06 TEAC |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Item 07 - APS Supplemental Projects - Presentation p. 11 |
Lime Kiln – Montgomery 230 kV Line | “At Lime Kiln and Montgomery substations: remove wave trap, upgrade circuit breakers” 230 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 100 |
Damascus – Montgomery 230 kV Line Misoperation Relay Project | “At Montgomery substation: Replace disconnect switches, line trap, substation conductor and relaying” 230 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2025 RTEP p. 4 |
Misoperation Relay Projects | “At Montgomery, replace CVT on bus” 230 kV |
| 2025-10-08 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 4 |
Misoperation Relay Projects | “At Montgomery, replace CVT on bus, disconnect switches, substation conductor and relaying” 230 kV |
| 2024-11-06 | TEAC Item 04 - APS Supplemental Projects p. 5 |
Lime Kiln – Montgomery 230 kV Line | No role wording 230 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 100 |
Damascus – Montgomery 230 kV Line Misoperation Relay Project | “At Montgomery substation:” 230 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.