Substation Scout

Sloan Drive

Named in 4 PJM planning documents for 3 projects, from October 8, 2024 to October 8, 2025.

Newdescribed as
DOMzone
230kVkV as printed
6mentions

Described as new: “extending new double circuit 230kV lines from future Sloan Drive Substation” — source, page 15

Also printed as: Sloan Drive Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Sloan Drive 230kV Delivery - DEV
DOM-2024-0022 · s3510.1
Engineering $25.0 M Q4 2027 100 MW 2024-10-08
TEAC
Meadowville 230kV Delivery - DEV
DOM-2024-0023 · s3671
Engineering $36.9M Q1 2028 300.0 MW 2025-10-08
TEAC
White Mountain 230kV Delivery - DEV
DOM-2024-0024 · s3672
Engineering $19.0M Q1 2028 100.0 MW 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named MEADOWVILLE; SLOAN DRIVE; WHITE MOUNTAIN → SLOAN DRIVE; WHITE MOUNTAIN 2024-12-03 2025-10-08

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Southern
Dominion p. 181
Sloan Drive 230kV Delivery - DEV “new substation (Sloan Drive)”
230kV
2025-10-08 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 17
Meadowville 230kV Delivery - DEV “future Sloan Drive Substation”
230kV
2025-10-08 TEAC
Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 19
White Mountain 230kV Delivery - DEV “future Sloan Drive Substation”
230kV
2024-12-03 TEAC
Item 10 - Dominion Supplemental Projects p. 15
Meadowville 230kV Delivery - DEV “extending new double circuit 230kV lines from future Sloan Drive Substation”
230kV
2024-12-03 TEAC
Item 10 - Dominion Supplemental Projects p. 17
White Mountain 230kV Delivery - DEV “extending a new 230kV feed from future Sloan Drive Substation”
230kV
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 181
Sloan Drive 230kV Delivery - DEV “DP Request for a new substation (Sloan Drive)”
230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this