Vermont Ave

Named in 5 PJM planning documents for 4 projects, from October 8, 2024 to July 7, 2026.

Existingdescribed as
JCPLzone
34.5 kVkV as printed
5mentions

Also printed as: Vermont Ave Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Metedconk and Vermont Ave 34.5 kV Substations
b4018.5
Not printed Not printed 6/1/2030 Not printed 2025-11-13
SRRTEP Mid-Atlantic
Metedconk and Vermont Ave 34.5 kV Substations Not printed $65.74 M 6/1/2030 Not printed 2025-10-16
SRRTEP Mid-Atlantic
Vermont Ave 34.5 kV Customer Connection
JCPL-2023-059 · s3284.1
Not printed $0.3M 03/31/2026 Not printed 2024-10-08
TEAC
Lakewood, NJ
JCPL-2026-026
Conceptual $292.4M 12/31/2032 Not printed 2026-07-07
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named VERMONT AVE → LARRABEE; LEISURE VILLAGE; SOUTH LAKEWOOD; VERMONT AVE 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 57
Vermont Ave 34.5 kV Customer Connection “connect to the existing 34.5 kV bus at Vermont Ave Substation”
34.5 kV
2026-07-07 TEAC
Item 07 - JCPL Supplemental Projects p. 9
Lakewood, NJ “Reconfigure the 34.5 kV yard at Vermont Ave to a 11 breaker, breaker and a half configuration using the existing breakers from the 34.5 kV ring bus and establish a new 115 kV ring bus with four 115 kV breakers installed.”
34.5 kV
2025-11-13 SRRTEP Mid-Atlantic
Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 32
Metedconk and Vermont Ave 34.5 kV Substations “Retire existing Vermont Ave 34.5 kV equipment”
34.5 kV
2025-10-16 SRRTEP Mid-Atlantic
Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 32
Metedconk and Vermont Ave 34.5 kV Substations “Retire existing Vermont Ave 34.5 kV equipment”
34.5 kV
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 57
Vermont Ave 34.5 kV Customer Connection “connect to the existing 34.5 kV bus at Vermont Ave Substation”
34.5 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.