Substation Scout

Nescopeck

Named in 7 PJM planning documents for 5 projects, from May 6, 2025 to October 6, 2026.

Newdescribed as
PPLzone
230kV, 500kVkV as printed
9mentions

Described as new: “Install a new three bay BAAH 230kV switchyard” — source, page 13

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Harwood, PA
PPL-2024-0003
Conceptual $195.55 M 06/01/2027 1,980 MW 2026-10-06
TEAC
PPL Transmission Zone: Supplemental
PPL-2025-0010 · S3818
Conceptual $88.5M 5/30/2027 1000 MW 2026-05-08
TEAC
Beach Haven, PA
PPL-2026-0003
Conceptual $81.2 M 05/30/2028 1,500 MW 2026-05-08
TEAC
Nescopeck, PA
PPL-2026-0004
Conceptual $130.6 M 05/30/2029 1,350 MW 2026-05-08
TEAC
Natalie 500-230kV Substation
PPL-2026-0029
Conceptual $408 M 12/30/2029 2,000 MW 2026-09-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $196.55 M → $195.55 M Not reported Not reported
Cost estimate $195.55 M → $196.55 M 2026-10-06 Not reported
Cost estimate $197.55 M → $195.55 M 2025-05-06 2026-10-06
In-service date 6/1/2026: S3528.1, S3528.6, & S3528.11 6/1/2027: S3528.2, S3528.3, S3528.4, S3528.5, S3528.7, S3528.8, S3528.9, S3528.10 → 06/01/2027 Not reported Not reported
In-service date 06/01/2027 → 6/1/2026: S3528.1, S3528.6, & S3528.11 6/1/2027: S3528.2, S3528.3, S3528.4, S3528.5, S3528.7, S3528.8, S3528.9, S3528.10 2026-10-06 Not reported
Status unknown (Development) → conceptual (Conceptual) 2025-05-06 2026-10-06
Substations named GLEN BROOK; HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; SUSQUEHANNA T10; TOMHICKEN → HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; TOMHICKEN Not reported Not reported
Substations named HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; TOMHICKEN → GLEN BROOK; HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; SUSQUEHANNA T10; TOMHICKEN 2026-10-06 Not reported
Substations named GLEN BROOK; HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; SUSQUEHANNA T10; TOMHICKEN → HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; TOMHICKEN 2025-05-06 2026-10-06
Cost estimate $95 M → $88.5M 2025-09-09 2026-05-08
Cost estimate
prior value printed on the same page
$95M → $88.5M 2026-05-08 2026-05-08
In-service date 05/2027 → 05/30/2028 2025-05-06 2025-09-09
In-service date 05/30/2028 → 5/30/2027 2025-09-09 2026-05-08
In-service date 5/2028 → 05/30/2028 2026-03-10 2026-05-08
In-service date 10/2028 → 05/30/2029 2026-03-10 2026-05-08
In-service date 06/2028 → 12/30/2029 2026-04-07 2026-09-08

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 13
Harwood, PA “Install a new three bay BAAH 230kV switchyard”
230kV
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 13
Harwood, PA “Install a new three bay BAAH 230kV switchyard”
230kV
2026-09-08 TEAC
Item 07 - PPL Supplemental Projects p. 5
Natalie 500-230kV Substation No role wording
500kV
2026-09-08* SRRTEP Mid-Atlantic
PPL local plan submission for 2024 RTEP p. 31
Harwood, PA “Install a new three bay BAAH 230kV switchyard”
230kV
2026-05-08 TEAC
Item 06 - PPL Supplemental Projects p. 12
Beach Haven, PA “(Originally went to Nescopeck under PPL-2025-0010)”
2026-05-08 TEAC
Item 06 - PPL Supplemental Projects p. 14
Nescopeck, PA “Install six new 230kV line terminals for the Customer lead lines at Nescopeck 230kV yard”
230kV
2026-05-08 TEAC
Item 06 - PPL Supplemental Projects p. 5
PPL Transmission Zone: Supplemental “Install a new DBDB (BAAH ultimate) bay at Nescopeck 230kV yard”
230kV
2025-09-09 TEAC
Item 09 - PPL Supplemental Projects p. 8
PPL Transmission Zone: Supplemental “Install a new DBDB (BAAH ultimate) bay at Nescopeck 230kV yard”
230kV
2025-05-06 TEAC
Item 07 - PPL Supplemental Projects p. 12
Harwood, PA “Install a new three bay BAAH 230kV switchyard”
230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this