Named in 2 PJM planning documents for 1 project, on October 8, 2024.

Existingdescribed as
DOMzone
138kVkV as printed
2mentions

Also printed as: Alleghany Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Alleghany 138kV Delivery Point - DEV
DOM-2022-0022 · s3045
Not printed $5.0 M 12/20/2023 21 MW 2024-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Southern
Dominion p. 73
Alleghany 138kV Delivery Point - DEV “inside Alleghany Substation, along with a wave trap, MOAB switch, circuit switcher”
138kV
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 73
Alleghany 138kV Delivery Point - DEV “backbone structure inside Alleghany Substation”
138kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.