Price Hill Substation
Named in 6 PJM planning documents for 4 projects, from October 8, 2024 to October 6, 2026.
Existingdescribed as
APSzone
138 kVkV as printed
8mentions
Also printed as: Price Hill
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| APS-2023-003 | Not printed | $0.3M | 5/8/2023 | 8 MVA | 2024-10-08 TEAC |
| Misoperation Relay Projects APS-2023-036, APS-2023-041 to APS-2023-043, APS-2023-045 to APS-2023-049 |
Not printed | $2.2 M | 11/29/2024 | Not printed | 2026-09-08* SRRTEP Western |
| Misoperation Relay Projects APS-2023-047 · s3113.1 |
Not printed | $2.3 M | 12/19/2023 | Not printed | 2024-10-08 TEAC |
| Price Hill Substation APS-2025-028 · s3868.1 |
Not printed | $0.10M | 04/03/2026 | Not printed | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | FRANKLIN; PURSELY → ARMSTRONG; CABOT; EDGELAWN; FAIRVIEW; FRANKLIN; GILBOA; GRASSY FALLS; HOUSEVILLE; MCCALMONT; PRICE HILL; PRUNTYTOWN; PURSELY; SUTTON; TRISSLER | 2024-10-08 | Not reported |
| Substations named | PRICE HILL; SOUTH MORGANTOWN → PRICE HILL | 2025-10-17 | 2026-10-06 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 34 |
Price Hill Substation | “Replace limiting substation conductor at Price Hill Substation” 138 kV |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 34 |
Price Hill Substation | “Replace limiting substation conductor at Price Hill Substation” |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 51 |
Misoperation Relay Projects | “At Price Hill Substation, replace line trap and relaying” 138 kV |
| 2026-09-08* | SRRTEP Western APS local plan submission of the supplemental projects for 2024 RTEP p. 81 |
APS-2023-003 | “Extend the Price Hill 138 kV bus by installing (1) 138 kV breaker and associated facilities to provide service to the Customer.” 138 kV |
| 2025-10-17 | SRRTEP Western Item 02 - APS Supplemental Projects p. 16 |
Price Hill Substation | “Replace limiting substation conductor at Price Hill Substation” |
| 2025-09-19 | SRRTEP Western Item 02 - APS Supplemental Projects p. 5 |
Price Hill Substation | “at Price Hill Substation. The substation conductor limits the capacity” 138 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 51 |
Misoperation Relay Projects | “At Price Hill Substation, replace line trap and relaying” 138 kV |
| 2024-10-08 | TEAC Informational Only - APS Local Plan submission of supplemental project 2024 p. 81 |
APS-2023-003 | “Extend the Price Hill 138 kV bus” 138 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.