Substation Scout

Mt. Healthy

Named in 4 PJM planning documents for 1 project, from April 15, 2026 to October 6, 2026.

Existingdescribed as
DEOKzone
138 kVkV as printed
4mentions

Also printed as: Mt. Healthy Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Mt. Healthy Substation Rebuild
DEOK-2026-002 · s3910.1 - .3
Engineering $8.6M 05/07/2029 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Status conceptual (Scoping) → engineering (Engineering) 2026-05-15 2026-10-06
Substations named FINNEYTOWN; MAPLEKNOLL; MT HEALTHY; TERMINAL; WILLEY → FINNEYTOWN; MAPLEKNOLL; MT HEALTHY; WILLEY 2026-10-06 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - DEOK Local Plan Submission of the supplemental projects for 2026 p. 9
Mt. Healthy Substation Rebuild “Mt. Healthy Substation: Replace necessary existing foundations, structures and devices”
138 kV
2026-09-30* SRRTEP Western
DEOK local plan submission of the supplemental projects for 2026 RTEP p. 8
Mt. Healthy Substation Rebuild “Replace necessary existing foundations, structures and devices”
138 kV
2026-05-15 SRRTEP Western
Item 06 - DEOK Supplemental Projects p. 3
Mt. Healthy Substation Rebuild “The 138 kV Mt. Healthy substation is a 53-year-old T-D manual switching station”
138 kV
2026-04-15 SRRTEP Western
Item 06 - DEOK Supplemental Projects p. 3
Mt. Healthy Substation Rebuild “Mt. Healthy Substation Rebuild”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this