Shinrock

Named in 10 PJM planning documents for 6 projects, from October 8, 2024 to October 16, 2026.

Existingdescribed as
ATSIzone
138 kV, 69 kVkV as printed
10mentions

Also printed as: Shinrock Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Cluster 2 (ATSI)
b3925.1
Not printed $217.32M 6/1/2029 Not printed 2025-01-07
TEAC
Cluster 2 (ATSI) Not printed $217.32M 6/1/2029 Not printed 2024-12-03
TEAC
ATSI Transmission Zone M-3 Process Adams - Shinrock 69 kV Line Customer Connection
ATSI-2024-043 · s3523.1
Not printed $0.15 M 10/31/2025 35 MVA 2024-10-08
TEAC
Black River – Shinrock 69 kV Line
ATSI-2024-072 · s3948.1
Not printed $67.65M 12/31/2029 Not printed 2026-10-06
TEAC
Huron Area
ATSI-2025-001
Not printed Not printed Not printed approximately 40 MVA 2025-01-17
SRRTEP Western
Carlisle-Shinrock 138 kV Line
ATSI-2026-066
Not printed Not printed Not printed Not printed 2026-10-16
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named AXTEL; BAUMHART; BLACK RIVER; SHINROCK; WASHINGTON → AXTEL; BAUMHART; BLACK RIVER; GREENFIELD; SHINROCK; WASHINGTON 2024-10-18 2026-07-17
Substations named AXTEL; BAUMHART; BLACK RIVER; GREENFIELD; SHINROCK; WASHINGTON → SHINROCK 2026-07-17 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-16 SRRTEP Western
Item 02 - ATSI Supplemental Projects Presentation p. 3
Carlisle-Shinrock 138 kV Line No role wording
138 kV
2026-10-06 TEAC
Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2026 p. 66
Black River – Shinrock 69 kV Line “Rebuild the section from Shinrock Substation to Str. 113=39 with double circuit structures”
2026-09-23* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2026 RTEP p. 66
Black River – Shinrock 69 kV Line “Rebuild the section from Shinrock Substation to Str. 113=39”
2026-09-08* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2024 RTEP p. 100
ATSI Transmission Zone M-3 Process Adams - Shinrock 69 kV Line Customer Connection “Adjust relay settings at Adams and Shinrock substations”
69 kV
2026-07-17 SRRTEP Western
Item 03 - ATSI Supplemental Projects p. 26
Black River – Shinrock 69 kV Line “Rebuild the section from Shinrock Substation to Str. 113=39 with double circuit structures”
69 kV
2025-01-17 SRRTEP Western
Item 05 - ATSI Supplemental Projects p. 4
Huron Area “opening breaker at Shinrock Substation”
2025-01-07 TEAC
Item 12 - Reliability Analysis Update p. 51
Cluster 2 (ATSI) No role wording
138 kV
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 72
Cluster 2 (ATSI) No role wording
138 kV
2024-10-18 SRRTEP Western
Item 04 - ATSI Supplemental Projects p. 3
Black River – Shinrock 69 kV Line No role wording
69 kV
2024-10-08 TEAC
Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 100
ATSI Transmission Zone M-3 Process Adams - Shinrock 69 kV Line Customer Connection “Adjust relay settings at Adams and Shinrock substations”
69 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.