Jackson
Named in 9 PJM planning documents for 8 projects, from October 8, 2024 to October 6, 2026.
Existingdescribed as
METEDzone
115 kV, 230 kV, 230kV, 69 kVkV as printed
14mentions
Also printed as: Jackson Substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Jackson – North Hanover 115 kV Line b4011.3 |
Not printed | $61.79 M | 6/1/2030 | Not printed | 2025-11-13 SRRTEP Mid-Atlantic |
| Jackson – North Hanover 115 kV Line | Not printed | $61.79 M | 6/1/2030 | Not printed | 2025-10-16 SRRTEP Mid-Atlantic |
| Hamilton 115 kV Ring Bus ME-2019-033 · s3339.1 |
Not printed | $7.70M | 06/01/2025 | Not printed | 2024-10-08 TEAC |
| Yorkana 230 kV Substation ME-2022-005 · s3340.1 |
Not printed | $3.70 M | 6/1/2025 | Not printed | 2024-10-08 TEAC |
| Hokes Ring Bus ME-2023-003 · s3263.1 |
Not printed | $24.1M | 6/1/2025 | Not printed | 2024-10-08 TEAC |
| North Hanover 115 kV Breaker and a Half Substation ME-2024-012 · s4016.1 |
Not printed | $36.79M | 12/29/2028 | 59 MW | 2026-10-06 TEAC |
| Jackson Substation, PA ME-2026-002 |
Not printed | Not printed | Not printed | Not printed | 2026-05-14 SRRTEP Mid-Atlantic |
| Hill - Jackson 115 kV 969 Line - New Customer Connection, PA ME-2026-006 |
Conceptual | $1.81M | 04/01/2028 | approximately 22 MW | 2026-07-17 SRRTEP Mid-Atlantic |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-07* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2026 RTEP p. 23 |
North Hanover 115 kV Breaker and a Half Substation | “Revise relay settings at Gitts Run, Hunterstown, and Jackson substations.” |
| 2026-10-06 | TEAC Informational Only - MetEd Local Plan Submission of Supplemental Projects for 2026 p. 23 |
North Hanover 115 kV Breaker and a Half Substation | “Revise relay settings at Gitts Run, Hunterstown, and Jackson substations” |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 30 |
Hamilton 115 kV Ring Bus | No role wording 115 kV |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 32 |
Yorkana 230 kV Substation | No role wording 230kV |
| 2026-09-08* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2024 RTEP p. 5 |
Hokes Ring Bus | No role wording 69 kV |
| 2026-07-17 | SRRTEP Mid-Atlantic Item 03 - MetEd Supplemental Projects p. 3 |
Hill - Jackson 115 kV 969 Line - New Customer Connection, PA | No role wording 115 kV |
| 2026-06-16 | SRRTEP Mid-Atlantic Item 03 - MetEd Supplemental Projects p. 8 |
North Hanover 115 kV Breaker and a Half Substation | “Revise relay settings at Gitts Run, Hunterstown, and Jackson substations.” |
| 2026-05-14 | SRRTEP Mid-Atlantic Item 06 - MetEd Supplemental Projects p. 3 |
Jackson Substation, PA | “The Jackson Substation 115 kV bus is currently configured” 115 kV |
| 2026-05-14 | SRRTEP Mid-Atlantic Item 06 - MetEd Supplemental Projects p. 5 |
Hill - Jackson 115 kV 969 Line - New Customer Connection, PA | No role wording 115 kV |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 16 |
Jackson – North Hanover 115 kV Line | “Replace limiting conductors, line relaying, circuit breaker and two 115 kV disconnect switches at Jackson” 115 kV |
| 2025-10-16 | SRRTEP Mid-Atlantic Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 16 |
Jackson – North Hanover 115 kV Line | “Replace limiting conductors, line relaying, circuit breaker and two 115 kV disconnect switches at Jackson” 115 kV |
| 2024-10-08 | TEAC Informational Only - METED Local Plan submission of supplemental project 2024 p. 30 |
Hamilton 115 kV Ring Bus | No role wording 115 kV |
| 2024-10-08 | TEAC Informational Only - METED Local Plan submission of supplemental project 2024 p. 32 |
Yorkana 230 kV Substation | No role wording 230 kV |
| 2024-10-08 | TEAC Informational Only - METED Local Plan submission of supplemental project 2024 p. 5 |
Hokes Ring Bus | No role wording 69 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.