Named in 4 PJM planning documents for 4 projects, from December 5, 2023 to October 6, 2026.

Expansiondescribed as
DOMzone
500-230 kV, 500kVkV as printed
5mentions

Expansion at an existing substation: new or expanded yard. The quoted wording describes a new or expanded yard, bus, bay or station at this substation. “Extend the existing 500kV ring bus at Goose Creek Substation” — source, page 9

Also printed as: Goose Creek Substation

Same name on other Substation Scout pages

Other sources that print a substation named “Goose Creek”. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

Part of named transmission projects: 2022 Window 3 West Cluster Incumbent Upgrades ($392.55M), 2022 Window 3 Northern Virginia/Doubs Cluster ($1,418.3M).

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Baseline 502 Jct-Woodside-Aspen 500 kV & Doubs Corridor Projects (DOM Portion)
b3800.118, b3800.120 & b3800.375
Not printed $73.94M 9/30/2030 (b3800.120 & b3800.375), 6/1/2028 (b3800.118) Not printed 2026-10-06
TEAC
2022W3 – Recommended Solutions: Northern Virginia/Doubs Cluster
B3800.200 – B3800.227
Not printed $1025.06 M 6/1/2028 Not printed 2023-12-05
TEAC
2022W3 – Recommended Solutions: Northern Virginia/Doubs Cluster
B3800.230 – B3800.242
Not printed $78.4 M 12/1/2027 Not printed 2023-12-05
TEAC
Do No Harm Analysis
DOM-2021-0016-DNH · s2609.2
In service $40.0 M 12/15/2023 Not printed 2024-10-08
TEAC

Other substations in these projects

The 4 projects above also name 34 other substations, with what the most recent document says about each.

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $35.59M → $73.94M 2023-12-05 2026-10-06
Cost estimate
prior value printed on the same page
$51.19M → $73.94M 2026-10-06 2026-10-06
In-service date 6/1/2027 → 9/30/2030 (b3800.120 & b3800.375), 6/1/2028 (b3800.118) 2023-12-05 2026-10-06
Substations named ASPEN; BISMARK; DOUBS; WOODSIDE → ASPEN; GOOSE CREEK; WOODSIDE 2023-12-05 2026-10-06
Cost estimate 138.5 M → $40.0 M 2026-11-03 Not reported
Cost estimate $40.0 M → 138.5 M 2024-10-08 2026-11-03
Cost estimate
prior value printed on the same page
$84.9 M → 138.5 M 2026-11-03 2026-11-03
In-service date 06/01/2029 → 12/15/2023 2026-11-03 Not reported
In-service date 12/15/2023 → 06/01/2029 2024-10-08 2026-11-03
Status engineering (Engineering) → in-service (In-Service) 2026-11-03 Not reported
Status in-service (In-Service) → engineering (Engineering) 2024-10-08 2026-11-03
Substations named BRADDOCK; HAYFIELD; OCCOQUAN; ODGEN MARTIN; POSSUM POINT → BEAUMEADE; BELMONT; CLARK; GOOSE CREEK; HARROWGATE; IDYLWOOD; LOCKS; PLEASANT VIEW; TYLER 2026-11-03 Not reported
Substations named BEAUMEADE; BELMONT; CLARK; GOOSE CREEK; HARROWGATE; IDYLWOOD; LOCKS; PLEASANT VIEW; TYLER → BRADDOCK; HAYFIELD; OCCOQUAN; ODGEN MARTIN; POSSUM POINT 2024-10-08 2026-11-03

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Item 16 - Reliability Analysis Update - Presentation p. 7
Baseline 502 Jct-Woodside-Aspen 500 kV & Doubs Corridor Projects (DOM Portion) “Terminate new NextEra 500 kV line from Woodside into Goose Creek substation”
500kV
2026-09-08* SRRTEP Southern
Dominion local plan submission of the supplemental projects for 2024 p. 9
Do No Harm Analysis “Extend the existing 500kV ring bus at Goose Creek Substation”
500-230 kV
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 9
Do No Harm Analysis “Extend the existing 500kV ring bus at Goose Creek Substation”
500-230 kV
2023-12-05 TEAC
Item 15 - Reliability Analysis Update 2022 Window 3 p. 41
2022W3 – Recommended Solutions: Northern Virginia/Doubs Cluster No role wording
500kV
2023-12-05 TEAC
Item 15 - Reliability Analysis Update 2022 Window 3 p. 45
2022W3 – Recommended Solutions: Northern Virginia/Doubs Cluster “Terminal equipment upgrades at the following substations: – Goose Creek, Pleasant View, Edwards Ferry”
500kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first